Power + Access 0200-1000 / limited hse participation. Cal'ed CDP after optics cleaning interior very dirty on laser side. DPB has burned out chip on board. Routine cleaning of XUVI, temps, etc. Switched GPS back to GARMIN!
Project Manager Notes:
CDP post cal
head size
water size
bin
10
8.9
7
20
16.1
14-15
30
24.4
18
40
32.5
21
pollen
18-19 - ???
FSSP
pollen
23
( -15)
Down stream leaks in CN plumbing was limiting flow
variation in FCN causing the odd values in FCNC special processing used on RF01-RF04. Revert to std processing RF05 ->