Anchorage Maintenance

RAF Daily Activity Sheet

Project Name: HIPPO-3 Date: 2010/04/14
Aircraft: G-V    Test:    Ferry: Flight Hour Allocation: flexible
Location: Global 2010/03/22 - 2010/04/15
PI: Wofsy / Stephens PM: Pavel Romashkin



Research Flight #: Flight Hrs: Project Total:

Data Summary: 
Data Start Time : UTC Data End Time : UTC

IRU Performance: IRU Serial #: 176
Departure Coordinates: LAT: LON:
Time in Nav: : UTC    
Destination Coordinates: LAT: LON:
Destination Read Out 1: LAT: LON:
Destination Read Out 2: LAT: LON:
Time Off: : UTC    

LAT Error LON Error Nav Time THDG Dest. LAT ERROR



Technician Notes:

RF09 at end had orange msg. on server, pci bus problem



Project Manager Notes:

Flask replacement / shipping; shipped AWAS flasks.

UHSAS removed and re-seated

UHSAS intermittent flow issue appears to be a readout issue. When flow goes high concentrations proportionally decrease, while size distributions remain correct.

May be able to recover data by using constant flow.

RF10: ADS froze twice, on take-off and on low approach @ Deadhorse.

dsm 313 froze @ high alt. return leg