Changes in 3/3/2008 version of floor plan include:
1. DISPLAY station removed from QCLS rack
2. Details on inlets, Displays added to the drawing
Previous layout (17/11/2007):
1. Relocation of Total H2O to L2, addition of dedicated heated HIMIL for it.
2. Relocation of CN to R5, closer to inlet.
3. Relocation of O3 to R4.
4. Addition of extra HIMIL for QCLS (pending availability of another HIMIL, needs to be built).