Entry
| Date
| Title
| Site
| Author
|
2 | Fri 15-Jul-1994 | OSU Sonic levels | none | Gordon Maclean
|
25 | Thu 04-Aug-1994 | Solent sonic anemometer reinstalled on | none | acd
|
38 | Sun 07-Aug-1994 | GILL running: | none | srs
|
57 | Tue 09-Aug-1994 | Work on the flux tower: | none | srs
|
58 | Tue 09-Aug-1994 | ATI angles from jd 220: | none | srs
|
59 | Wed 10-Aug-1994 | New ATI angles: | none | srs
|
92 | Sun 14-Aug-1994 | Cleaned water off 10m ati flux: | none | srs
|
93 | Sun 14-Aug-1994 | Flux sonic boom angles added to sonic.c | none | srs
|
94 | Sun 14-Aug-1994 | Another cleaning of ati.10m.flux: | none | srs
|
95 | Sun 14-Aug-1994 | ATI.10m.flux looking good! | none | srs
|
104 | Mon 15-Aug-1994 | Move Solent position on walk-up tower b | none | acd
|
108 | Mon 15-Aug-1994 | Data from Solent is bad! | none | srs
|
114 | Tue 16-Aug-1994 | ATI.10m.walk level sensor plug fixed | none | pa
|
116 | Tue 16-Aug-1994 | atik.flux sonics revived | none | spo
|
135 | Thu 18-Aug-1994 | Cleaned ati sonic cards | none | spo
|
151 | Sat 20-Aug-1994 | reseated atik.10m.flux transducers | none | spo
|
154 | Sat 20-Aug-1994 | playing around with atik.10m.flux | none | spo
|
156 | Sat 20-Aug-1994 | more atik.10m.flux work | none | spo
|
158 | Sun 21-Aug-1994 | sonic work continued.. | none | spo
|
170 | Tue 23-Aug-1994 | sonic work | none | spo
|
176 | Tue 23-Aug-1994 | 15-m ATI W sensors re-seated | none | spo
|
178 | Tue 23-Aug-1994 | Zeroed atik.10m.flux | none | spo
|
186 | Wed 24-Aug-1994 | Tower work | none | spo
|
234 | Thu 01-Sep-1994 | Walk-up ATI spiking | none | sn
|
252 | Sat 03-Sep-1994 | higher variances on ati.10m.flux seen on jd 245 | none | Charlie Martin
|
274 | Mon 05-Sep-1994 | Water inside ATI sonic box | none | Santiago Newbery
|
275 | Mon 05-Sep-1994 | sonic ATI OSU walkup grounded at ca. 1400 Mon 9-5-94 | none | Rick Vong
|
282 | Tue 06-Sep-1994 | ATI sonic on walkup now is grounded (OSU) | none | Rick Vong
|
298 | Thu 08-Sep-1994 | solent tc shows high variance | none | Charlie Martin
|
331 | Thu 15-Sep-1994 | Water beads on ati.10m.walk w | none | Tom Horst
|
348 | Mon 19-Sep-1994 | Dried out sonic electronics | none | Tom Horst
|
370 | Fri 23-Sep-1994 | 10m Sonic zeroes | none | Tom Horst
|
375 | Sat 24-Sep-1994 | ATI sonic (OSU) zero air chambers at 1259 GMT 6 pm Fri eve 9-23-94 | none | Rick Vong
|
- 2: SONIC /none Fri 15-Jul-1994 22:55:51 GMT OSU Sonic levels
OSU Sonic levels
Level sensors for OSU ATI sonic
At this point we believe that the level sensors on the OSU sonic did not
come from ATI, but that the electronics includes an A/D board for levels.
So the level output could possibly be digitized and the serial output format
made identical to the NCAR ati sonics.
Assuming this won't work, 2 analog channels, marigold 116 and 117, have
been config'd - though this may exceed our breakout box capacity.
The calibration offset and gains for converting to degrees are in
prep.config. The dids are (tlev,slev).atik.10m.walk, for transverse
level and streamwise level.
The OSU sonic serial output should be terse, and does not have to contain
levels. The sio_converters scan string is %hd %hd %hd %hd %hd %hd,
which expects 6 integers. If there are only 4, everything will
still work, just that the last 2 fields will be garbage. These last 2
are alev and blev, which we can ignore. Perhaps we could set them to
null but I'm not sure the software can handle that.
- 25: SONIC /none Thu 04-Aug-1994 18:31:37 GMT Solent sonic anemometer reinstalled on
Solent sonic anemometer reinstalled on walkup tower
The solent was taken down at ~ 1000 and the jumpers were checked : all OK
The Solent sonic anemometer was realigned on its mount such
that the u axis is along the stream axis at right angles to the
round boom. This is in accordance to the diagram on page 42 of
the Solent manual. (NB the diagram on page 41 is not applicable)
There is an indication from the cockpit display that the v winds
are 180 degrees off with respect to the ATI on the walkup tower.
When the Solent sonic anemometer was reinstalled on walkup tower
it was leveled to within 0.1 degrees while the boom was in the
southern swing-back position.
- 38: SONIC /none Sun 07-Aug-1994 03:17:48 GMT GILL running:
GILL running:
The serial cable to the Gill
was modified to get a -12v signal
on RTS. The sonic is now running.
We still need to change the sign
convention for the v component
in the calibration program.
- 57: SONIC /none Tue 09-Aug-1994 22:53:56 GMT Work on the flux tower:
Work on the flux tower:
Work on the flux tower has been
going on all day. The 10m and 15m sonics
were brought down to try to resolve the
TC problem.
The 10m TC signal looked fine once it
was on the ground. The 15m stayed bad at
ground level. After recalibration the sensors
were installed. Cables were routed on the outside
incase they need to come down again.
Work on the tower stopped at about 23:30 GMT.
- 58: SONIC /none Tue 09-Aug-1994 23:47:50 GMT ATI angles from jd 220:
ATI angles from jd 220:
The sonic boom alignment was
shot yesterday. Due to limited
access, the "v" component was used.
angles:
ATI.10m 213 25' 50"
ATI.15m 213 04' 10"
- 59: SONIC /none Wed 10-Aug-1994 00:30:52 GMT New ATI angles:
New ATI angles:
After working on the sonics new angles
for the booms were computed.
There was a change of about 1 degree.
This was probable due to the additional
tower guys added yesterday. New angles
were shot at 00:15 GMT, jd 222.
angles:
ATI.10m 214 22' 00"
ATI.15m 214 20' 50"
- 92: SONIC /none Sun 14-Aug-1994 17:56:40 GMT Cleaned water off 10m ati flux:
Cleaned water off 10m ati flux:
Water was removed from the ati.10m.flux
at 17:50 GMT. It did not make a change
in the spikes.
- 93: SONIC /none Sun 14-Aug-1994 18:49:43 GMT Flux sonic boom angles added to sonic.c
Flux sonic boom angles added to sonic.config.S
- 94: SONIC /none Sun 14-Aug-1994 19:58:39 GMT Another cleaning of ati.10m.flux:
Another cleaning of ati.10m.flux:
The tower was climbed again, at 19:50 GMT,
to try cleaning the ati. We are still getting
noise on the w component. There is also
noise on the 10m krypton.
- 95: SONIC /none Sun 14-Aug-1994 20:07:36 GMT ATI.10m.flux looking good!
ATI.10m.flux looking good!
Recycling power on the 10m ati
cleaned up the w component. Also
tryed recycling power on krypton, no
improvement.
- 104: SONIC /none Mon 15-Aug-1994 21:17:23 GMT Move Solent position on walk-up tower b
Move Solent position on walk-up tower boom.
At ~ 1300 pdt the solent was switch off and then relocated from
its position to the left (looking outward ) of the atik
to a position to the right of the atik between the atik and
the FSSP. It was repowered at approx 1415 pdt.
- 108: SONIC /none Mon 15-Aug-1994 23:09:52 GMT Data from Solent is bad!
Data from Solent is bad!
Since solent was moved we have not
gotten good data from it. Will try recycling
power.
- 114: SONIC /none Tue 16-Aug-1994 05:19:30 GMT ATI.10m.walk level sensor plug fixed
ATI.10m.walk level sensor plug fixed
- 116: SONIC /none Tue 16-Aug-1994 19:25:06 GMT atik.flux sonics revived
atik.flux sonics revived
I cycled power on both the 10m and 15m boxes and got both
sonics running again (no noise, reasonable (compared to .walk
sonics) values, tc onscale). There was condensation(?) in the
10m box, but the 15m was dry.
Later in the day, we adjusted (slightly) both .flux sonics.
They were mostly OK, but I did make changes to most channels.
We should rezero sometime, but I don't expect there to be any
changes.
- 135: SONIC /none Thu 18-Aug-1994 22:03:48 GMT Cleaned ati sonic cards
Cleaned ati sonic cards
We "erased" the edge connectors and reseated all the electronic
boards in the ati electronic box of both 10m and 15m atik.flux.
The sonics now appear to be working, but this may not have anything
to do with our efforts.
- 151: SONIC /none Sat 20-Aug-1994 17:24:27 GMT reseated atik.10m.flux transducers
reseated atik.10m.flux transducers
This done to try to get better performance out of this sonic, which
has been bad a large fraction of the time. I wanted to reseat the
main sonic cable also, but couldn't manage to disconnect it without
more force than I felt comfortable with up the tower. Note that
I was up the tower for about 10-15 min. doing this. I toggled the
"on-tower" switch (from the "walk") position a few minutes after I
came down. It should be easy to tell from the level and sonic data
information also.
- 154: SONIC /none Sat 20-Aug-1994 22:34:51 GMT playing around with atik.10m.flux
playing around with atik.10m.flux
I've just returned from the tower where I reseated the main sonic
connector on the atik.10m.flux. I still notice some spikes.
The on-tower switch is still on since I may go up again to pull the
array completely down.
- 156: SONIC /none Sat 20-Aug-1994 23:53:57 GMT more atik.10m.flux work
more atik.10m.flux work
We went ahead and dropped the sonic, even though it wasn't looking
too bad, so we could adjust it with a good "zero wind" condition.
We ended up just reseating transducers again to get rid of some
amplitude "jumps" in the w-axis. As long as we had it on the ground,
we zeroed it.
It is now operating with the cal chambers on all of the axes and
we are looking at it on xstrip to see if any problems occur.
Obviously, the fast T at this height also is down (in fact, it is
in my pocket now).
- 158: SONIC /none Sun 21-Aug-1994 01:39:51 GMT sonic work continued..
sonic work continued..
We ran the atik.10m.flux for 15 min on the ground and
saw U go into a spikey mode. We replaced the U transducers
with new ones and ran for another 5-10 min with it looking
okay(?). Since clouds were coming in, we ran it back up
the mast.
We also reinstalled the fast T probe.
As long as we were doing tower work, we installed the boom
for the IR hygrometer which we may install tomorrow.
- 170: SONIC /none Tue 23-Aug-1994 16:01:40 GMT sonic work
sonic work
We looked at the atik.10m.flux on the scope while we knew
it was spiking and saw probable mistriggers on U, occasional
noise (asynchronous receive signals) on V, and constant noise
on W. We cycled power, which seems to have helped a bit, and
reduced the U signal somewhat with the potentiometer.
We'll try drying the arrays off when the towers dry off (hopefully
pretty soon since there is some sun), and we'll probably do
a few other things (zero the channels).
- 176: SONIC /none Tue 23-Aug-1994 20:29:03 GMT 15-m ATI W sensors re-seated
15-m ATI W sensors re-seated
That appears to have brought the signal back into
reasonable looking levels, and consistent with the
10-m ATI-W.
- 178: SONIC /none Tue 23-Aug-1994 21:04:17 GMT Zeroed atik.10m.flux
Zeroed atik.10m.flux
This done to remove the bias in Tc. It seems to have helped.
I cycled the fast T switch since it was necessary to remove
the probe in order to zero W.
- 186: SONIC /none Wed 24-Aug-1994 17:37:52 GMT Tower work
Tower work
I was on the tower from about 20-10 min ago (and forgot to throw
the tower switch) to do 2 things:
1 - Clean the 10m Krypton window. This brought it on scale,
but it still is very noisy.
2 - Dry and reseat 15m ATI transducers. This fixed U and V, but
W is still bad.
- 234: SONIC /none Thu 01-Sep-1994 20:31:06 GMT Walk-up ATI spiking
Walk-up ATI spiking
The v channel on the walk-up ATI is spiking more now.
We tried grounding the box, but no changes.
Note u and w chan. OK
- 252: SONIC /none Sat 03-Sep-1994 17:52:49 GMT higher variances on ati.10m.flux seen on jd 245
Noted higner variances (compared to other sonics)
on the ati.10m.flux wind components near the end
of day jd 245 and 1500-1600.
- 274: SONIC /none Mon 05-Sep-1994 18:35:09 GMT Water inside ATI sonic box
After the rain I checked all the instrumentation boxes by
the flux tower, and found plenty of water in the lower ATI box.
This is the second time for this particular unit, so keep an
eye on it after rain events.
- 275: SONIC /none Mon 05-Sep-1994 21:28:51 GMT sonic ATI OSU walkup grounded at ca. 1400 Mon 9-5-94
Charlie and I grounded thee boom/IMT on the walkup tower at 2pm or so. The
very noisy v component on the OSU ATI cleaned up completely after being
fully grounded. We addded another ground to the ATI case with no perceived
change but decided to keep both case and boom/IMT grounded. Apparently
the boom is insulated from the tower thru the bushing on the boom-shaft.
- 282: SONIC /none Tue 06-Sep-1994 23:51:16 GMT ATI sonic on walkup now is grounded (OSU)
By 1215 (noon) today we finally had a robust ground onthe ATI OSU sonic.
V had been spiking this am again, probably because the ground was not 'solid'.
- 298: SONIC /none Thu 08-Sep-1994 22:18:40 GMT solent tc shows high variance
Solent data shows high variance in tc over the last day;
started to diverge from other sonic tc's around 19 Z JD 250
w:tc's for jd 250 also show divergences from the ati
measurements.
It was raining hard and very gusty from 18Z onward, jd 250
- 331: SONIC /none Thu 15-Sep-1994 17:10:26 GMT Water beads on ati.10m.walk w
Water beads on the upper w transducer of the 10m walkup ati have been
clobbering the signal. Andy has wiped it off, but it keeps reforming.
Need more wind (or Delany air blast!).
- 348: SONIC /none Mon 19-Sep-1994 20:50:30 GMT Dried out sonic electronics
Opened the sonic electronics boxes on the flux tower and found liquid
water in them. Dried them out.
- 370: SONIC /none Fri 23-Sep-1994 23:52:24 GMT 10m Sonic zeroes
Remeasured sonic zeroes at 10m since yesterday's data was lost. This
occurred from approximately 4:45-4:50 pm PDT.
- 375: SONIC /none Sat 24-Sep-1994 01:01:00 GMT ATI sonic (OSU) zero air chambers at 1259 GMT 6 pm Fri eve 9-23-94
OSU ATI sonic has zero chambers (3) on now at 6pm PDT