CACHE94: LOG Messages: 5 Entries..

Return to Logbook Contents Page
Entry Date Title Site Author
82Fri 12-Aug-1994Archive tapes for 222,223 have added fi noneOperator
159Sun 21-Aug-1994check time w/ WWV nonespo
167Mon 22-Aug-1994marigold covars restarted nonespo
173Tue 23-Aug-1994Lots of work will be done today nonespo
363Fri 23-Sep-1994raw data for day 265 lostnoneGordon Maclean


82: LOG /none Fri 12-Aug-1994 18:31:53 GMT Archive tapes for 222,223 have added fi
Archive tapes for 222,223 have added files: 
 
 Archive tape for 222 has archive files for 
day 221 and 222 on it. Archive tape 223 has 
day 222 and 223. The backup directory was 
not cleaned after the archive tapes were 
made. 
 
159: LOG /none Sun 21-Aug-1994 02:49:43 GMT check time w/ WWV
check time w/ WWV 
 
aster's time is 1 min, 5 sec  ahead. 
 
167: LOG /none Mon 22-Aug-1994 20:50:20 GMT marigold covars restarted
marigold covars restarted 
 
This done to use phase delays on the licor, both to set the 
0.7s tube delay measured earlier for flux measurements and 
to compensate for the delay getting the mode signal. 
 
prep calls the calibration routines before phase shifting, 
so this doesn't help the mode problem, but covar hopefully 
will work, since it shifts first. 
 
173: LOG /none Tue 23-Aug-1994 18:01:55 GMT Lots of work will be done today
Lots of work will be done today 
 
I don't know if we'll keep up with logbook.  John is presently working 
on psycs by taking down the 2.5m for a wiring comparison. 
 
We have a lot of other things to do and will try to note them. 
 
363: LOG /none Fri 23-Sep-1994 16:19:09 GMT raw data for day 265 lost
Some bonehead deleted yesterdays raw data before it had been written to
tape.  Hmmm... wonder who that could have been...

Luckily no cloud events occured on day 265.  We'll have to redo the 15m
sonic zero on the flux tower.  Peter Antoni also lost some CO2
flow analysis data.