Third operational period


ops3: jd(1994, 221, 18:48:00 - 1994, 224, 15:41:00)

The CO2 mode channel (marigold 105) was changed from being archived in walk/slow to being archived in walk/fast. It was sampled at 1 hz until day 232.

The Licor CO2 went on-line on day 221. (See logbook #15, #55.)