| Entry
| Date
| Title
| Site
| Author
| #Graphics
|
| 209 | Sun 15-Aug-2004 | Sounding Bahia Kino 16 August 0000Z | ISS3 (Bahia Kino) | Rebeca
|
| 208 | Sun 15-Aug-2004 | Daily Report for August 15 | ISS3 (Bahia Kino) | Rebeca
|
| 207 | Sun 15-Aug-2004 | Sounding Bahia Kino 15 August 12Z | ISS3 (Bahia Kino) | Heather
|
| 206 | Sat 14-Aug-2004 | Daily Report for August 14 | ISS3 (Bahia Kino) | Heather
|
| 205 | Sat 14-Aug-2004 | Sounding Bahia Kino 15 August 00Z | ISS3 (Bahia Kino) | Heather
|
| 204 | Sat 14-Aug-2004 | Sounding Bahia Kino 14 August 12z | ISS3 (Bahia Kino) | Jennifer
|
| 203 | Fri 13-Aug-2004 | Sounding Bahia Kino 14 August 0z | ISS3 (Bahia Kino) | Jennifer
|
| 202 | Fri 13-Aug-2004 | Daily Report for August 13 | ISS3 (Bahia Kino) | Rebeca
|
| 201 | Fri 13-Aug-2004 | Sounding Bahia Kino 13 August 1800Z | ISS3 (Bahia Kino) | Rebeca
|
| 200 | Fri 13-Aug-2004 | Sounding Bahia Kino 13 August 1200Z | ISS3 (Bahia Kino) | Rebeca
|
| 199 | Fri 13-Aug-2004 | Sounding Bahia Kino 13 August 6Z | ISS3 (Bahia Kino) | Heather
|
| 198 | Thu 12-Aug-2004 | Daily Report for August 12 | ISS3 (Bahia Kino) | Rebeca
|
| 197 | Thu 12-Aug-2004 | Sounding Bahia Kino 13 August 0z | ISS3 (Bahia Kino) | Jennifer
|
| 196 | Thu 12-Aug-2004 | Sounding Bahia Kino 12 August 1800z | ISS3 (Bahia Kino) | Rebeca
|
| 195 | Thu 12-Aug-2004 | Sounding Bahia Kino 12 August 12z | ISS3 (Bahia Kino) | Jennifer
|
| 194 | Thu 12-Aug-2004 | Sounding Bahia Kino 12 August 0600Z | ISS3 (Bahia Kino) | Rebeca
|
| 193 | Wed 11-Aug-2004 | Sounding Bahia Kino 12 August 0000Z | ISS3 (Bahia Kino) | Rebeca
|
| 192 | Wed 11-Aug-2004 | Daily Report for August 11 | ISS3 (Bahia Kino) | Rebeca
|
| 191 | Wed 11-Aug-2004 | P. Penasco Motosat problems | ISS2 (Puerto Penasco) | Lou
|
| 190 | Wed 11-Aug-2004 | Kino Roving team visit | ISS3 (Bahia Kino) | June
|
| 189 | Wed 11-Aug-2004 | Sounding Bahia Kino 11 August 18Z | ISS3 (Bahia Kino) | Heather
|
| 188 | Wed 11-Aug-2004 | Sounding Bahia Kino 11 August 12z | ISS3 (Bahia Kino) | Jennifer
|
| 187 | Wed 11-Aug-2004 | Sounding Bahia Kino 11 August 0600z | ISS3 (Bahia Kino) | Rebeca
|
| 186 | Tue 10-Aug-2004 | Sounding Bahia Kino 11 August 0z | ISS3 (Bahia Kino) | Jennifer
|
| 185 | Tue 10-Aug-2004 | Sounding Bahia Kino 10 August 18z | ISS3 (Bahia Kino) | Jennifer
|
| 184 | Tue 10-Aug-2004 | Daily Report for August 10 | ISS3 (Bahia Kino) | Rebeca
|
| 183 | Tue 10-Aug-2004 | Sounding Bahia Kino 10 August 12Z | ISS3 (Bahia Kino) | Heather
|
| 182 | Tue 10-Aug-2004 | Sounding Bahia Kino 10 August 0600Z | ISS3 (Bahia Kino) | Heather
|
| 181 | Mon 09-Aug-2004 | Sounding Bahia Kino 10 August 00Z | ISS3 (Bahia Kino) | Rebeca
|
| 180 | Mon 09-Aug-2004 | Daily Report for August 9 | ISS3 (Bahia Kino) | Heather
|
| 179 | Mon 09-Aug-2004 | Sounding Bahia Kino 9 August 18Z | ISS3 (Bahia Kino) | Heather
|
| 178 | Mon 09-Aug-2004 | Sounding Bahia Kino 9 August 1200z | ISS3 (Bahia Kino) | Rebeca
|
| 177 | Sun 08-Aug-2004 | Daily Report for August 8 | ISS3 (Bahia Kino) | Rebeca
|
| 176 | Sun 08-Aug-2004 | Sounding Bahia Kino 9 August 0000z | ISS3 (Bahia Kino) | Rebeca
|
| 175 | Sun 08-Aug-2004 | Sounding Bahia Kino 8 August 12z | ISS3 (Bahia Kino) | Jennifer
|
| 174 | Sun 08-Aug-2004 | Sounding Bahia Kino 8 August 0600Z | ISS3 (Bahia Kino) | Rebeca
|
| 173 | Sat 07-Aug-2004 | Sounding Bahia Kino 8 August 0000Z | ISS3 (Bahia Kino) | Rebeca
|
| 172 | Sat 07-Aug-2004 | Daily Report for August 7 | ISS3 (Bahia Kino) | Heather
|
| 171 | Sat 07-Aug-2004 | Sounding Bahia Kino 7 August 18Z | ISS3 (Bahia Kino) | Heather
|
| 170 | Sat 07-Aug-2004 | Sounding Bahia Kino 7 August 12z | ISS3 (Bahia Kino) | Jennifer
|
| 169 | Sat 07-Aug-2004 | Sounding Bahia Kino 7 August 0600z | ISS3 (Bahia Kino) | Rebeca
|
| 168 | Fri 06-Aug-2004 | Sounding Bahia Kino 7 August 0000z | ISS3 (Bahia Kino) | Rebeca
|
| 167 | Fri 06-Aug-2004 | Daily Report for August 6 | ISS3 (Bahia Kino) | Jennifer
|
| 166 | Fri 06-Aug-2004 | Sounding Bahia Kino 6 August 18z | ISS3 (Bahia Kino) | Jennifer
|
| 165 | Fri 06-Aug-2004 | Power Outage at 12z launch! | ISS3 (Bahia Kino) | Jennifer
|
| 164 | Fri 06-Aug-2004 | Sounding Bahia Kino 6 August 12z | ISS3 (Bahia Kino) | Jennifer
|
| 163 | Fri 06-Aug-2004 | Sounding Bahia Kino 6 August 0600z | ISS3 (Bahia Kino) | Rebeca
|
| 162 | Fri 06-Aug-2004 | Daily Report for August 5 | ISS3 (Bahia Kino) | Rebeca
|
| 161 | Thu 05-Aug-2004 | Sounding Bahia Kino 6 August 0000z | ISS3 (Bahia Kino) | Rebeca
|
| 160 | Thu 05-Aug-2004 | Power Outage! | ISS3 (Bahia Kino) | Jennifer
|
| 159 | Thu 05-Aug-2004 | Sounding Bahia Kino 5 August 18z | ISS3 (Bahia Kino) | Jennifer
|
| 158 | Thu 05-Aug-2004 | Sounding Bahia Kino 5 August 12z | ISS3 (Bahia Kino) | Jennifer
|
| 157 | Wed 04-Aug-2004 | Sounding Bahia Kino 5 August 0000Z RE-LAUNCH | ISS3 (Bahia Kino) | Rebeca
|
| 156 | Wed 04-Aug-2004 | Daily Report for August 4 | ISS3 (Bahia Kino) | Rebeca
|
| 155 | Wed 04-Aug-2004 | Sounding Bahia Kino 5 August 0000Z | ISS3 (Bahia Kino) | Rebeca
|
| 154 | Wed 04-Aug-2004 | Sounding Bahia Kino 4 August 12Z | ISS3 (Bahia Kino) | Heather
|
| 153 | Wed 04-Aug-2004 | Sounding Bahia Kino 4 August 0600z | ISS3 (Bahia Kino) | Jennifer
|
| 152 | Tue 03-Aug-2004 | Daily Report for August 2 | ISS3 (Bahia Kino) | Rebeca
|
| 151 | Tue 03-Aug-2004 | Sounding Bahia Kino 4 August 0Z | ISS3 (Bahia Kino) | Heather
|
| 150 | Tue 03-Aug-2004 | Sounding Bahia Kino 3 August 1800z | ISS3 (Bahia Kino) | Jennifer
|
| 149 | Tue 03-Aug-2004 | Sounding Bahia Kino 3 August 1200z | ISS3 (Bahia Kino) | Heather
|
| 148 | Mon 02-Aug-2004 | Daily Report for August 3 | ISS3 (Bahia Kino) | Heather
|
| 147 | Mon 02-Aug-2004 | Sounding Bahia Kino 3 August 0z | ISS3 (Bahia Kino) | Jennifer
|
| 146 | Mon 02-Aug-2004 | Sounding Bahia Kino 2 August 1200Z | ISS3 (Bahia Kino) | Rebeca
|
| 145 | Mon 02-Aug-2004 | Clary UPS malfunction | | Rebeca
|
| 144 | Sun 01-Aug-2004 | Daily Report for August 1 | ISS3 (Bahia Kino) | Heather
|
| 143 | Sun 01-Aug-2004 | Sounding Bahia Kino 2 August 0Z | ISS3 (Bahia Kino) | Heather
|
| 142 | Sun 01-Aug-2004 | Sounding Bahia Kino 1 August 1800Z | ISS3 (Bahia Kino) | Rebeca
|
| 141 | Sun 01-Aug-2004 | Sounding Bahia Kino 1 August 12Z | ISS3 (Bahia Kino) | Heather
|
| 140 | Sun 01-Aug-2004 | Sounding Bahia Kino 1 August 0600z | ISS3 (Bahia Kino) | Jennifer
|
| 139 | Sat 31-Jul-2004 | Daily Report for July 31 | ISS3 (Bahia Kino) | Heather
|
| 138 | Sat 31-Jul-2004 | Sounding Bahia Kino 1 August 0Z | ISS3 (Bahia Kino) | Heather
|
| 137 | Sat 31-Jul-2004 | Sounding Bahia Kino 31 July 1200z | ISS3 (Bahia Kino) | Jennifer
|
| 136 | Fri 30-Jul-2004 | Daily Report for July 30 | ISS3 (Bahia Kino) | Jennifer
|
| 135 | Fri 30-Jul-2004 | Sounding Bahia Kino 31 July 0z | ISS3 (Bahia Kino) | Jennifer
|
| 134 | Fri 30-Jul-2004 | Sounding Bahia Kino 30 July 1200Z | ISS3 (Bahia Kino) | Rebeca
|
| 133 | Thu 29-Jul-2004 | Sounding Bahia Kino 30 July 0000Z | ISS3 (Bahia Kino) | Rebeca
|
| 132 | Thu 29-Jul-2004 | Roving team COMMENTS ON LOS MOCHIS | ISS3 (Bahia Kino) | Steve/John
|
| 131 | Thu 29-Jul-2004 | Roving team notes for July 29 | ISS3 (Bahia Kino) | Steve/John
|
| 130 | Thu 29-Jul-2004 | Daily Report for July 29 | ISS3 (Bahia Kino) | Heather
|
| 129 | Thu 29-Jul-2004 | Sounding Bahia Kino 29 July 18Z | ISS3 (Bahia Kino) | Rebeca
|
| 128 | Thu 29-Jul-2004 | Sounding Bahia Kino 29 July 1200Z | ISS3 (Bahia Kino) | Rebeca
|
| 127 | Thu 29-Jul-2004 | Sounding Bahia Kino 29 July 06Z | ISS3 (Bahia Kino) | Heather
|
| 126 | Wed 28-Jul-2004 | Daily Report for July 28 | ISS3 (Bahia Kino) | Jennifer
|
| 125 | Wed 28-Jul-2004 | Sounding Bahia Kino 29 July 0z | ISS3 (Bahia Kino) | Jennifer
|
| 124 | Wed 28-Jul-2004 | Sounding Bahia Kino 28 July 1800Z | ISS3 (Bahia Kino) | Rebeca
|
| 123 | Wed 28-Jul-2004 | Sounding Bahia Kino 28 July 1200Z | ISS3 (Bahia Kino) | Rebeca
|
| 122 | Wed 28-Jul-2004 | Sounding Bahia Kino 28 July 0600Z | ISS3 (Bahia Kino) | Rebeca
|
| 121 | Tue 27-Jul-2004 | Sounding Bahia Kino 28 July 0Z | ISS3 (Bahia Kino) | Steve/John
|
| 120 | Tue 27-Jul-2004 | Roving team notes from LORETO visit | ISS3 (Bahia Kino) | Steve/John
|
| 119 | Tue 27-Jul-2004 | Roving team notes | ISS3 (Bahia Kino) | Steve/John
|
| 118 | Tue 27-Jul-2004 | Profiler performance | ISS3 (Bahia Kino) | Steve/John
|
| 117 | Tue 27-Jul-2004 | Profiler data backup and down time (NAME_KIN03) | ISS3 (Bahia Kino) | Steve/John
|
| 116 | Tue 27-Jul-2004 | Sounding Bahia Kino 27 July 12z | ISS3 (Bahia Kino) | Rebeca
|
| 115 | Tue 27-Jul-2004 | Daily Report for July 26 | ISS3 (Bahia Kino) | Jennifer
|
| 114 | Mon 26-Jul-2004 | Sounding Bahia Kino 27 July 0z | ISS3 (Bahia Kino) | Jennifer
|
| 113 | Mon 26-Jul-2004 | Sounding Bahia Kino 26 July 12z | ISS3 (Bahia Kino) | Jennifer
|
| 112 | Mon 26-Jul-2004 | Power Outage! | ISS3 (Bahia Kino) | Brad
|
| 111 | Sun 25-Jul-2004 | Daily Report for July 25 | ISS3 (Bahia Kino) | Jennifer
|
| 110 | Sun 25-Jul-2004 | Sounding Bahia Kino 26 July 0z | ISS3 (Bahia Kino) | Jennifer
|
| 109 | Sun 25-Jul-2004 | Sounding Bahia Kino 25 July 12Z | ISS3 (Bahia Kino) | Rebeca
|
| 108 | Sat 24-Jul-2004 | Daily Report for July 24 | ISS3 (Bahia Kino) | Heather
|
| 107 | Sat 24-Jul-2004 | Sounding Bahia Kino 25 July 0Z | ISS3 (Bahia Kino) | Heather
|
| 106 | Sat 24-Jul-2004 | Sounding Bahia Kino 24 July 12Z | ISS3 (Bahia Kino) | Heather
|
| 105 | Fri 23-Jul-2004 | Daily Report for July 23 | ISS3 (Bahia Kino) | Heather
|
| 104 | Fri 23-Jul-2004 | Sounding Bahia Kino 24 July 0z | ISS3 (Bahia Kino) | Heather
|
| 103 | Fri 23-Jul-2004 | Sounding Bahia Kino 23 July 12z | ISS3 (Bahia Kino) | Jennifer
|
| 102 | Fri 23-Jul-2004 | Daily Report for July 22 | ISS3 (Bahia Kino) | Jennifer
|
| 101 | Thu 22-Jul-2004 | Sounding Bahia Kino 23 July, 0z | ISS3 (Bahia Kino) | Brad
|
| 100 | Thu 22-Jul-2004 | Profiler failure | ISS3 (Bahia Kino) | Steve/John
|
| 99 | Thu 22-Jul-2004 | Roving team notes: Thursday July 22 | ISS3 (Bahia Kino) | Steve/John
|
| 98 | Thu 22-Jul-2004 | Sounding Bahia Kino 22 July 18Z | ISS3 (Bahia Kino) | Heather
|
| 97 | Thu 22-Jul-2004 | Sounding Bahia Kino 22 July 12Z | ISS3 (Bahia Kino) | Heather
|
| 96 | Thu 22-Jul-2004 | Sounding Bahia Kino 22 July 6Z | ISS3 (Bahia Kino) | Heather
|
| 95 | Thu 22-Jul-2004 | Daily Report for July 21 | ISS3 (Bahia Kino) | Heather
|
| 94 | Wed 21-Jul-2004 | Sounding Bahia Kino 22 July 0Z | ISS3 (Bahia Kino) | Heather
|
| 93 | Wed 21-Jul-2004 | Sounding Bahia Kino 21 July 18z | ISS3 (Bahia Kino) | Jennifer
|
| 92 | Wed 21-Jul-2004 | Sounding Bahia Kino 21 July 12Z | ISS3 (Bahia Kino) | Jennifer
|
| 91 | Wed 21-Jul-2004 | Sounding Bahia Kino 21 July, 6z | ISS3 (Bahia Kino) | Brad
|
| 90 | Wed 21-Jul-2004 | Daily Report for July 20 | ISS3 (Bahia Kino) | Jennifer
|
| 89 | Tue 20-Jul-2004 | Sounding Bahia Kino 21 July 0z | ISS3 (Bahia Kino) | Jennifer
|
| 88 | Tue 20-Jul-2004 | Sounding Bahia Kino 20 July 18Z | ISS3 (Bahia Kino) | Heather
|
| 87 | Tue 20-Jul-2004 | Sounding Bahia Kino 20 July 12Z | ISS3 (Bahia Kino) | Heather
|
| 86 | Tue 20-Jul-2004 | Sounding Bahia Kino 20 July 06Z | ISS3 (Bahia Kino) | Heather
|
| 85 | Tue 20-Jul-2004 | Daily Report for July 19 | ISS3 (Bahia Kino) | Jennifer
|
| 84 | Mon 19-Jul-2004 | Sounding Bahia Kino 20 July 0Z | ISS3 (Bahia Kino) | Jennifer
|
| 83 | Mon 19-Jul-2004 | Sounding Bahia Kino 19 July 12Z | ISS3 (Bahia Kino) | Heather
|
| 82 | Mon 19-Jul-2004 | LNA DC voltage measured | ISS3 (Bahia Kino) | Steve/John
|
| 81 | Mon 19-Jul-2004 | Clary GT1000 UPS running for GAOS | ISS3 (Bahia Kino) | Steve/John
|
| 80 | Mon 19-Jul-2004 | Daily report for July 18 | ISS3 (Bahia Kino) | Jennifer
|
| 79 | Sun 18-Jul-2004 | Sounding Bahia Kino 19 July 0Z | ISS3 (Bahia Kino) | Heather
|
| 78 | Sun 18-Jul-2004 | Roving team report for July 18 | ISS3 (Bahia Kino) | Steve/John
|
| 77 | Sun 18-Jul-2004 | IRT down during quick check. | ISS3 (Bahia Kino) | Steve/John
|
| 76 | Sun 18-Jul-2004 | Profiler data backup and down time | ISS3 (Bahia Kino) | Steve/John
|
| 75 | Sun 18-Jul-2004 | Sounding Bahia Kino 18 July 12Z | ISS3 (Bahia Kino) | Heather
|
| 74 | Sat 17-Jul-2004 | Daily report for July 17 | ISS3 (Bahia Kino) | Jennifer
|
| 73 | Sat 17-Jul-2004 | Sounding Bahia Kino 18 July 0z | ISS3 (Bahia Kino) | Jennifer
|
| 72 | Sat 17-Jul-2004 | Sounding Bahia Kino July 17th, 12z | ISS3 (Bahia Kino) | Brad
|
| 71 | Sat 17-Jul-2004 | Sounding Bahia Kino 17 July 0Z | ISS3 (Bahia Kino) | Heather
|
| 70 | Fri 16-Jul-2004 | Daily Report for July 16 | ISS3 (Bahia Kino) | Heather
|
| 69 | Fri 16-Jul-2004 | Sounding Bahia Kino 16 July 12z | ISS3 (Bahia Kino) | Jennifer
|
| 68 | Fri 16-Jul-2004 | Daily report July 15 and Power Outage Wrap-up | ISS3 (Bahia Kino) | Brad
|
| 67 | Fri 16-Jul-2004 | Power Outage! | ISS3 (Bahia Kino) | Brad
|
| 66 | Thu 15-Jul-2004 | Sounding Bahia Kino 16 July 0Z | ISS3 (Bahia Kino) | Heather
|
| 65 | Thu 15-Jul-2004 | Sounding Bahia Kino 15 July 12Z | ISS3 (Bahia Kino) | Heather
|
| 64 | Thu 15-Jul-2004 | Daily report for July 15 | ISS3 (Bahia Kino) | Brad
|
| 63 | Wed 14-Jul-2004 | Sounding Bahia Kino 15 July 0z | ISS3 (Bahia Kino) | Jennifer
|
| 62 | Wed 14-Jul-2004 | Sounding Bahia Kino 14 July 18z | ISS3 (Bahia Kino) | Jennifer
|
| 61 | Wed 14-Jul-2004 | Sounding Bahia Kino 14 July 12z | ISS3 (Bahia Kino) | Heather
|
| 60 | Wed 14-Jul-2004 | Sounding Bahia Kino 14 July, 06Z | ISS3 (Bahia Kino) | Heather
|
| 59 | Wed 14-Jul-2004 | Daily report for July 14 | ISS3 (Bahia Kino) | Heather
|
| 58 | Tue 13-Jul-2004 | Daily report for Power-up 23z 7/13 | ISS3 (Bahia Kino) | Brad
|
| 57 | Tue 13-Jul-2004 | Sounding Bahia Kino 14 July, 00Z | ISS3 (Bahia Kino) | Heather
|
| 56 | Tue 13-Jul-2004 | Sounding Bahia Kino 13 July, 18z | ISS3 (Bahia Kino) | Jennifer
|
| 55 | Tue 13-Jul-2004 | Sounding Bahia Kino 13 July, 12z | ISS3 (Bahia Kino) | Jennifer
|
| 54 | Tue 13-Jul-2004 | Sounding Bahia Kino 13 July, 6z | ISS3 (Bahia Kino) | Jennifer
|
| 53 | Tue 13-Jul-2004 | Daily report for July 13 | ISS3 (Bahia Kino) | Heather
|
| 52 | Mon 12-Jul-2004 | Sounding Bahia Kino 13 July, 00z | ISS3 (Bahia Kino) | Brad
|
| 51 | Mon 12-Jul-2004 | Measured CLASS pre-amp voltages | ISS3 (Bahia Kino) | Steve/John
|
| 50 | Mon 12-Jul-2004 | LIST OF BACKUP DISKS | ISS3 (Bahia Kino) | Steve/John
|
| 49 | Mon 12-Jul-2004 | Roving team notes | ISS3 (Bahia Kino) | Steve/John
|
| 48 | Mon 12-Jul-2004 | Confirmed PYG wiring; matches Puerto Penasco | ISS3 (Bahia Kino) | Steve/John
|
| 47 | Mon 12-Jul-2004 | Sounding Bahia Kino 12 July, 18z | ISS3 (Bahia Kino) | Jennifer
|
| 46 | Mon 12-Jul-2004 | Sounding Bahia Kino 12 July, 12z | ISS3 (Bahia Kino) | Jennifer
|
| 45 | Mon 12-Jul-2004 | Sounding Bahia Kino 12 July, 6z | ISS3 (Bahia Kino) | Brad
|
| 44 | Sun 11-Jul-2004 | Daily report for Sunday July 12 | ISS3 (Bahia Kino) | Heather
|
| 43 | Sun 11-Jul-2004 | Sounding Bahia Kino July 12th, 0z | ISS3 (Bahia Kino) | Heather
|
| 42 | Sun 11-Jul-2004 | Sounding Bahia Kino July 11th, 12z | ISS3 (Bahia Kino) | Jennifer
|
| 41 | Sun 11-Jul-2004 | Daily report for Saturday July 11 | ISS3 (Bahia Kino) | Heather
|
| 40 | Sun 11-Jul-2004 | Daily report for Saturday July 10 | ISS3 (Bahia Kino) | Jennifer
|
| 39 | Sat 10-Jul-2004 | Sounding Bahia Kino July 11th, 0z | ISS3 (Bahia Kino) | Heather
|
| 38 | Sat 10-Jul-2004 | Sounding Bahia Kino Saturday July 10, 12z | ISS3 (Bahia Kino) | Brad
|
| 37 | Sat 10-Jul-2004 | Sounding Bahia Kino Saturday July 10 6z | ISS3 (Bahia Kino) | Jennifer
|
| 36 | Sat 10-Jul-2004 | Sounding Bahia Kino Template | ISS3 (Bahia Kino) | Jennifer
|
| 35 | Sat 10-Jul-2004 | Daily report for Friday July 9 | ISS3 (Bahia Kino) | Jennifer
|
| 34 | Fri 09-Jul-2004 | tklog fixed at Los Mochis | ISS3 (Bahia Kino) | Charlie
|
| 33 | Fri 09-Jul-2004 | IR Radiation Sensor Tests | ISS3 (Bahia Kino) | Charlie
|
| 32 | Fri 09-Jul-2004 | Sounding Bahia Kino Friday July 9th 18z | ISS3 (Bahia Kino) | Brad
|
| 31 | Fri 09-Jul-2004 | Sounding Bahia Kino Friday July 9th 12z | ISS3 (Bahia Kino) | Heather
|
| 30 | Fri 09-Jul-2004 | Sounding Bahia Kino Friday July 9 6z launch | ISS3 (Bahia Kino) | Brad
|
| 29 | Thu 08-Jul-2004 | Sounding Bahia Kino for Friday July 9 00Z | ISS3 (Bahia Kino) | Brad
|
| 28 | Thu 08-Jul-2004 | Daily report for Thursday, July 8 | ISS3 (Bahia Kino) | Brad
|
| 27 | Thu 08-Jul-2004 | Sounding Bahia Kino for Thursday July 8 18z | ISS3 (Bahia Kino) | Brad
|
| 26 | Thu 08-Jul-2004 | Sounding Bahia Kino for Thurs. July 08 12z | ISS3 (Bahia Kino) | Jennifer
|
| 25 | Thu 08-Jul-2004 | Sounding Bahia Kino for Thursday July 8 06Z | ISS3 (Bahia Kino) | Heather
|
| 24 | Thu 08-Jul-2004 | Daily report for Wed. July 07 | ISS3 (Bahia Kino) | Jennifer
|
| 23 | Wed 07-Jul-2004 | Sounding Bahia Kino for Wed. July 08 0Z | ISS3 (Bahia Kino) | Heather
|
| 22 | Wed 07-Jul-2004 | Sounding Bahia Kino for Wed. July 07 18z | ISS3 (Bahia Kino) | Jennifer
|
| 21 | Wed 07-Jul-2004 | Sounding Bahia Kino for Wed. July 07 12z | ISS3 (Bahia Kino) | Jennifer
|
| 20 | Tue 06-Jul-2004 | Sounding Launch 00z July 7 | ISS3 (Bahia Kino) | Brad
|
| 19 | Tue 06-Jul-2004 | Daily report for Tuesday July 6 Power Up | ISS3 (Bahia Kino) | Brad
|
| 18 | Tue 06-Jul-2004 | Daily report for Tuesday July 6 | ISS3 (Bahia Kino) | Brad
|
| 17 | Tue 06-Jul-2004 | Sounding Launch 12z July 6 | ISS3 (Bahia Kino) | Heather
|
| 16 | Mon 05-Jul-2004 | Daily report for Mon. July 5 | ISS3 (Bahia Kino) | Brad
|
| 15 | Mon 05-Jul-2004 | Sounding Bahia Kino for Monday July 6 0z | UMBS | Heather
|
| 14 | Mon 05-Jul-2004 | Profiler settings | ISS3 (Bahia Kino) | Bill
|
| 13 | Mon 05-Jul-2004 | Daily report for Sun July 4 | ISS3 (Bahia Kino) | Bill
|
| 12 | Mon 05-Jul-2004 | training session | ISS3 (Bahia Kino) | Operator
|
| 11 | Sun 04-Jul-2004 | Sounding Bahia Kino Sun July 5 0Z | ISS3 (Bahia Kino) | Jennifer
|
| 10 | Sun 04-Jul-2004 | training session | ISS3 (Bahia Kino) | Charlie
|
| 9 | Sun 04-Jul-2004 | Profiler repaired | ISS3 (Bahia Kino) | Bill
|
| 8 | Sun 04-Jul-2004 | Daily report for Sat July 3 | ISS3 (Bahia Kino) | Bill
|
| 7 | Sat 03-Jul-2004 | Sounding Launch 3 Jul 2215 | ISS3 (Bahia Kino) | Brad
|
| 6 | Sat 03-Jul-2004 | Daily report for Fri July 2 | ISS3 (Bahia Kino) | Bill
|
| 5 | Fri 02-Jul-2004 | fixed ssh port forwarding | ISS3 (Bahia Kino) | Charlie
|
| 4 | Fri 02-Jul-2004 | Daily report for Thu July 1 | ISS3 (Bahia Kino) | Bill
|
| 3 | Tue 29-Jun-2004 | Its Alive | ISS3 (Bahia Kino) | Lou
|
| 2 | Tue 27-Jun-2000 | Sounding Bahia Kino Saturday 10 0z | ISS3 (Bahia Kino) | Jennifer
|
| 1 | Tue 11-Apr-2000 | Logbook created | none | iss
|
- 209: SOUNDING, Site ISS3 (Bahia Kino), Sun 15-Aug-2004 22:42:58 GMT, Sounding Bahia Kino 16 August 0000Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408412104
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1006.84
Temp C : 34.29
RH % : 52.5
For Surface Data
Pressure mb : 1009.0
Temp C : 33.9
RH% : 53.6
Wind Spd m/s : 4.7
Wind Dir deg : 231
Pre-Launch Note conditions not observable by automatic systems
Weather Description sunny and clear. convection to north and east. some
cumulus towers to west, light breeze.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb :
Termination Altitude km :
Reason for Termination :
Post-Termination Weather Description:
For Surface Data
Pressure mb :
Temp C :
RH % :
Wspd m/s :
Wdir deg :
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 208: DAILY, Site ISS3 (Bahia Kino), Sun 15-Aug-2004 11:35:12 GMT, Daily Report for August 15
All systems normal.
HE tanks:3
sondes: 8
balloons: 10
Profiler disk write: 37.8%
voltage: 133.4 on ct.4
Weather: sunny over our area with large amounts of convection to the east
- 207: SOUNDING, Site ISS3 (Bahia Kino), Sun 15-Aug-2004 11:32:13 GMT, Sounding Bahia Kino 15 August 12Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408412415
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.21
Temp C : 28.64
RH % : 85.00
For Surface Data
Pressure mb : 1010.9
Temp C : 28.5
RH% : 86.3
Wind Spd m/s : 2.9
Wind Dir deg : 109
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Clear and calm
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 40.1
Termination Altitude km : 22.052
Reason for Termination : sonde stopped transmitting data
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1011.3
Temp C : 27.048
RH % : 88.727
Wspd m/s : .68373
Wdir deg : 69.038
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 206: DAILY, Site ISS3 (Bahia Kino), Sat 14-Aug-2004 22:46:33 GMT, Daily Report for August 14
All systems normal.
HE tanks:4
sondes: 10
balloons: 14
Profiler disk write:34.4%
voltage: 131.7 on ct.4
Weather: Dark this morning when we left the site, large convective towers have
been building to the North all the way around to the east and also to the west. Breezy and hot today.
- 205: SOUNDING, Site ISS3 (Bahia Kino), Sat 14-Aug-2004 22:45:28 GMT, Sounding Bahia Kino 15 August 00Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 00Z
Sonde coef tape #:408411910
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.28
Temp C : 33.44
RH % : 51.70
For Surface Data
Pressure mb : 1009.6
Temp C : 33.7
RH% : 61.5
Wind Spd m/s : 5.7
Wind Dir deg : 208
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Clear above, strong convection all around site,hot and breezy.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 47.6
Termination Altitude km : 21.247
Reason for Termination : lost signal
Post-Termination Weather Description: Same as above, convection to the NNE has
gotten deeper, anvil cloud can be seen to the NE.
For Surface Data
Pressure mb : 1008.8
Temp C : 33.281
RH % : 65.465
Wspd m/s : 4.0484
Wdir deg : 231.92
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 204: SOUNDING, Site ISS3 (Bahia Kino), Sat 14-Aug-2004 10:39:28 GMT, Sounding Bahia Kino 14 August 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408412412
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.18
Temp C : 27.64
RH % : 62.9
For Surface Data
Pressure mb : 1011.3
Temp C : 27.6
RH% : 67.3
Wind Spd m/s : 4.1
Wind Dir deg : 182
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 63.8
Termination Altitude km : 19.254
Reason for Termination : Lost signal.
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1011.4
Temp C : 26.117
RH % : 70.164
Wspd m/s : 2.3742
Wdir deg : 35.47
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 203: SOUNDING, Site ISS3 (Bahia Kino), Fri 13-Aug-2004 22:37:04 GMT, Sounding Bahia Kino 14 August 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408412303
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.16
Temp C : 32.79
RH % : 68.04
For Surface Data
Pressure mb : 1009.7
Temp C : 33.5
RH% : 69.1
Wind Spd m/s : 5.6
Wind Dir deg : 211
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies with stratus to the N.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 52.3
Termination Altitude km : 20.664
Reason for Termination : Stopped transmitting data.
Post-Termination Weather Description: Clear skies with stratus to the N and E.
For Surface Data
Pressure mb : 1009
Temp C : 32.343
RH % : 73.848
Wspd m/s : 4.9075
Wdir deg : 208.75
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 202: DAILY, Site ISS3 (Bahia Kino), Fri 13-Aug-2004 16:41:45 GMT, Daily Report for August 13
All systems normal.
HE tanks: 4 3/5
sondes: 12
balloons: 18
Profiler disk write:30.8%
voltage
Weather: Clear and sunny all day.
- 201: SOUNDING, Site ISS3 (Bahia Kino), Fri 13-Aug-2004 16:37:43 GMT, Sounding Bahia Kino 13 August 1800Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18Z
Sonde coef tape #: 408411914
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1012.32
Temp C : 34.40
RH % : 53.70
For Surface Data
Pressure mb :1013.6
Temp C : 34.2
RH% : 57.9
Wind Spd m/s : 4.2
Wind Dir deg : 203
Pre-Launch Note conditions not observable by automatic systems
Weather Description hot, sunny and clear in all directions
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 44.9
Termination Altitude km : 21.555
Reason for Termination : lost signal
Post-Termination Weather Description: sunny and clear, scattered cumulus to NE, light breeze
For Surface Data
Pressure mb :1013.2
Temp C : 34.675
RH % : 53.687
Wspd m/s : 6.0884
Wdir deg : 195.72
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 200: SOUNDING, Site ISS3 (Bahia Kino), Fri 13-Aug-2004 10:50:02 GMT, Sounding Bahia Kino 13 August 1200Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408403902
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.12
Temp C : 28.81
RH % : 84.3
For Surface Data
Pressure mb :1011.2
Temp C : 28.8
RH% : 85.3
Wind Spd m/s : 1.8
Wind Dir deg : 69
Pre-Launch Note conditions not observable by automatic systems
Weather Description clear sky, humid
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 33.0
Termination Altitude km : 23.415
Reason for Termination : balloon burst
Post-Termination Weather Description: clear skies, humid
For Surface Data
Pressure mb : 1011.7
Temp C : 28.014
RH % : 86.568
Wspd m/s : 2.3416
Wdir deg : 91.337
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 199: SOUNDING, Site ISS3 (Bahia Kino), Fri 13-Aug-2004 04:36:25 GMT, Sounding Bahia Kino 13 August 6Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 6Z
Sonde coef tape #: 408402504
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.09
Temp C : 30.76
RH % : 79.90
For Surface Data
Pressure mb : 1011.3
Temp C : 30.3
RH% : 78.5
Wind Spd m/s : 4.1
Wind Dir deg : 228
Pre-Launch Note conditions not observable by automatic systems
Weather Description
CLear skies with ligtening to the north and east.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 36.7
Termination Altitude km : 22.765
Reason for Termination : balloon burst
Post-Termination Weather Description: Falling stars and SE winds, no lightening spotted at time of obs.
For Surface Data
Pressure mb : 1011.4
Temp C : 30.563
RH % : 80.716
Wspd m/s : 3.7593
Wdir deg : 226.51
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 198: DAILY, Site ISS3 (Bahia Kino), Thu 12-Aug-2004 22:41:40 GMT, Daily Report for August 12
All systems normal.
HE tanks: 5 1/5
sondes: 16
balloons:22
Profiler disk write:27.3%
voltage 132.9
Weather: Clear and sunny today with some clouds and lightning in the distance this morning.
- 197: SOUNDING, Site ISS3 (Bahia Kino), Thu 12-Aug-2004 22:38:13 GMT, Sounding Bahia Kino 13 August 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408411901
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.2
Temp C : 34.47
RH % : 60.2
For Surface Data
Pressure mb : 1010.1
Temp C : 33
RH% : 65.5
Wind Spd m/s : 4.8
Wind Dir deg : 233
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 33.9
Termination Altitude km : 23.489
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Cirrus to the NE and W.
For Surface Data
Pressure mb : 1009.1
Temp C : 32.875
RH % : 67.508
Wspd m/s : 2.8773
Wdir deg : 212.97
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 196: SOUNDING, Site ISS3 (Bahia Kino), Thu 12-Aug-2004 16:39:29 GMT, Sounding Bahia Kino 12 August 1800z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18z
Sonde coef tape #: 408411913
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1011.3
Temp C : 33.57
RH % : 74.60
For Surface Data
Pressure mb :1012.5
Temp C : 33.1
RH% : 50.9
Wind Spd m/s : 3.04
Wind Dir deg : 128
Pre-Launch Note conditions not observable by automatic systems
Weather Description sunny and clear stratus clouds to N
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 35.3
Termination Altitude km : 23.084
Reason for Termination : lost signal
Post-Termination Weather Description: sunny and clear with a light breeze
For Surface Data
Pressure mb : 1012.3
Temp C : 33.365
RH % : 61.409
Wspd m/s : 3.2546
Wdir deg : 222.18
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
sonde humidity was higher than sfc humidity by a factor of around 20. we waited for it to stabalize but it did not and we decided to proceed with the launch. on the launch screen, raw met data still had the sonde humidity at around 70 but
the 10-sec data has it showing up at around 50 before we launched.
- 195: SOUNDING, Site ISS3 (Bahia Kino), Thu 12-Aug-2004 10:47:07 GMT, Sounding Bahia Kino 12 August 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408402503
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.87
Temp C : 27.67
RH % : 87.10
For Surface Data
Pressure mb : 1011.3
Temp C : 27.5
RH% : 87.8
Wind Spd m/s : 2.7
Wind Dir deg : 53
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear with lightning to the NNE.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 41.3
Termination Altitude km : 21.976
Reason for Termination : Lost signal.
Post-Termination Weather Description: Cumulus in all directions with lightning to the NE.
For Surface Data
Pressure mb : 1013.2
Temp C : 28.233
RH % : 84.414
Wspd m/s : 4.0092
Wdir deg : 76.704
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 194: SOUNDING, Site ISS3 (Bahia Kino), Thu 12-Aug-2004 04:43:27 GMT, Sounding Bahia Kino 12 August 0600Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 6Z
Sonde coef tape #: 408403903
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb :1009.60
Temp C : 30.58
RH % :75.60
For Surface Data
Pressure mb :1011.1
Temp C : 30.7
RH% : 76.7
Wind Spd m/s :4.7
Wind Dir deg :204
Pre-Launch Note conditions not observable by automatic systems
Weather Description clear night, lightning to north, humid
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 54.2
Termination Altitude km : 20.313
Reason for Termination : stopped recieving data
Post-Termination Weather Description: overcast, humid, light breeze
For Surface Data
Pressure mb : 1011.3
Temp C : 30.131
RH % : 80.043
Wspd m/s : 2.8283
Wdir deg : 164.04
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 193: SOUNDING, Site ISS3 (Bahia Kino), Wed 11-Aug-2004 22:39:00 GMT, Sounding Bahia Kino 12 August 0000Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408411904
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.82
Temp C : 32.37
RH % : 79.1
For Surface Data
Pressure mb :1009.3
Temp C : 32.5
RH% : 73.0
Wind Spd m/s : 5.2
Wind Dir deg : 227
Pre-Launch Note conditions not observable by automatic systems
Weather Description sunny and clear with a light breeze, convection to the
north and east.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 41.6
Termination Altitude km : 22.117
Reason for Termination : lost signal
Post-Termination Weather Description: sunny and clear, light breeze, convection
to the north.
For Surface Data
Pressure mb : 1008.5
Temp C : 32.072
RH % : 71.088
Wspd m/s : 3.8344
Wdir deg : 216.89
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 192: DAILY, Site ISS3 (Bahia Kino), Wed 11-Aug-2004 22:38:18 GMT, Daily Report for August 11
All systems normal.
HE tanks: 7 2/5
sondes: 21
balloons:27
Profiler disk write:24.1%
voltage 133.2 on Ct4
Weather: sunny and clear during the day, cloudy at night, convection to the
north and east and a light breeze througout the day/night.
- 191: INFO, Site ISS2 (Puerto Penasco), Wed 11-Aug-2004 19:07:47 GMT, P. Penasco Motosat problems
Since yesterday afternoon I've been working with the operators at Penasco to fix the motosat system. In theory the system should be working. All tests have have worked fine . System passed calibrate sensors ,good sat numbers for strengh and quality. System has been shutdown and rebooted ,dish stowed and brought up
again. GPS up dates when refreshed.
Still time out error messages when attempting to go to any web site.
Currently waiting on a return call from Eagle Computers to discuss what could
be happening.
From what operators have said porblems started after some disruption in power
to the system.
- 190: INFO, Site ISS3 (Bahia Kino), Wed 11-Aug-2004 18:51:16 GMT, Kino Roving team visit
The roving team (Lou and June) visited Kino site on Aug. 10 and Aug. 11. Here is a summary for our visit:
(1) Profiler data backup: We stopped the profiler at 20:05-20:55 UTC on Aug. 10 to back up the profiler data. The data were backed up to two CDs (NAME_KIN04 and NAME_KIN05). We left one copy in the trailer and brought one copy with us. After backup, the disk was ~20% full.
(2) Data backup on DM computer: We backed up raw and NIMA data on DM computer on two DVDs (one for raw and one for NIMA), left one copy in the trailer and brought one copy with us.
- 189: SOUNDING, Site ISS3 (Bahia Kino), Wed 11-Aug-2004 16:41:08 GMT, Sounding Bahia Kino 11 August 18Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18Z
Sonde coef tape #: 408411909
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.7
Temp C : 33.97
RH % : 55.40
For Surface Data
Pressure mb :1012.3
Temp C : 33.3
RH% : 60.7
Wind Spd m/s : 4.2
Wind Dir deg : 214
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Cirrus to the NNE, some convection to the North.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 47.6
Termination Altitude km : 21.174
Reason for Termination : Balloon burst
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1012
Temp C : 33.334
RH % : 66.651
Wspd m/s : 5.6344
Wdir deg : 219.7
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 188: SOUNDING, Site ISS3 (Bahia Kino), Wed 11-Aug-2004 10:41:55 GMT, Sounding Bahia Kino 11 August 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408403900
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.14
Temp C : 27.56
RH % : 100
For Surface Data
Pressure mb : 1010.5
Temp C : 27.5
RH% : 90
Wind Spd m/s : 2.1
Wind Dir deg : 51
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 38.4
Termination Altitude km : 22.431
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Mostly clear with some alto cumulus to the NNE.
For Surface Data
Pressure mb : 1010.9
Temp C : 27.42
RH % : 91.758
Wspd m/s : 1.3322
Wdir deg : 105.17
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 187: SOUNDING, Site ISS3 (Bahia Kino), Wed 11-Aug-2004 04:39:37 GMT, Sounding Bahia Kino 11 August 0600z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 6z
Sonde coef tape #: 408402502
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.63
Temp C : 30.29
RH % : 73.40
For Surface Data
Pressure mb :1011.6
Temp C : 30.5
RH% : 73.3
Wind Spd m/s : 3.1
Wind Dir deg : 180
Pre-Launch Note conditions not observable by automatic systems
Weather Description cloudy with a light breeze and humid.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 39.5
Termination Altitude km : 22.302
Reason for Termination : balloon burst
Post-Termination Weather Description: humid, cloudy with a light breeze
For Surface Data
Pressure mb : 1011.2
Temp C : 29.834
RH % : 80.573
Wspd m/s : 2.7875
Wdir deg : 152.62
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 186: SOUNDING, Site ISS3 (Bahia Kino), Tue 10-Aug-2004 22:42:21 GMT, Sounding Bahia Kino 11 August 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408411900
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.39
Temp C : 32.61
RH % : 71.30
For Surface Data
Pressure mb : 1010.8
Temp C : 32.8
RH% : 71.8
Wind Spd m/s : 5.5
Wind Dir deg : 204
Pre-Launch Note conditions not observable by automatic systems
Weather Description Layer of stratus to the E with convection to the N.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 56.7
Termination Altitude km : 20.161
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Overcast with cumulus in all directions.
For Surface Data
Pressure mb : 1010.1
Temp C : 31.531
RH % : 75.988
Wspd m/s : 4.95
Wdir deg : 182.39
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 185: SOUNDING, Site ISS3 (Bahia Kino), Tue 10-Aug-2004 16:43:49 GMT, Sounding Bahia Kino 10 August 18z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18z
Sonde coef tape #: 408403905
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1011.10
Temp C : 32.9
RH % : 51.8
For Surface Data
Pressure mb : 1013.7
Temp C : 32.3
RH% : 59.3
Wind Spd m/s : 2.3
Wind Dir deg : 142
Pre-Launch Note conditions not observable by automatic systems
Weather Description Alto cumulus in all directions.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 34.7
Termination Altitude km : 23.157
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Mostly clear.
For Surface Data
Pressure mb : 1013.1
Temp C : 33.376
RH % : 61.309
Wspd m/s : 5.4547
Wdir deg : 219.37
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 184: DAILY, Site ISS3 (Bahia Kino), Tue 10-Aug-2004 10:46:14 GMT, Daily Report for August 10
All systems normal.
HE tanks:7
sondes:25
balloons:31
Profiler disk write:21.3%
voltage 134.0on Ct4
Weather: convection to the N and NE with occasional low cumulus clouds and humid
- 183: SOUNDING, Site ISS3 (Bahia Kino), Tue 10-Aug-2004 10:45:01 GMT, Sounding Bahia Kino 10 August 12Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #: 408403901
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.67
Temp C : 28.08
RH % : 75.90
For Surface Data
Pressure mb :1011.7
Temp C : 28.2
RH% : 75.8
Wind Spd m/s : 6.5
Wind Dir deg : 136
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Overcast, breezy, lightening to the ESE.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 73.4
Termination Altitude km : 18.455
Reason for Termination : balloon burst
Post-Termination Weather Description:overcast, winds light.
For Surface Data
Pressure mb : 1011.3
Temp C : 27.226
RH % : 80.656
Wspd m/s : 2.2321
Wdir deg : 99.6
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 182: SOUNDING, Site ISS3 (Bahia Kino), Tue 10-Aug-2004 04:50:53 GMT, Sounding Bahia Kino 10 August 0600Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 6Z
Sonde coef tape #: 408412113
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.94
Temp C : 31.05
RH % : 80.80
For Surface Data
Pressure mb : 1011.2
Temp C : 30.9
RH% : 80.6
Wind Spd m/s : 2.2
Wind Dir deg : 92.0
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Clear, lightening to the north .
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 57.2
Termination Altitude km : 20.021
Reason for Termination : sonde stopped transmitting data
Post-Termination Weather Description:
very dark, possibly overcast
For Surface Data
Pressure mb : 1012.2
Temp C : 30.865
RH % : 75.228
Wspd m/s : 1.734
Wdir deg : 120.51
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 181: SOUNDING, Site ISS3 (Bahia Kino), Mon 09-Aug-2004 22:43:32 GMT, Sounding Bahia Kino 10 August 00Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 00Z
Sonde coef tape #: 408400705
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.16
Temp C : 33.82
RH % : 70.8
For Surface Data
Pressure mb : 1008.9
Temp C : 33.4
RH% : 71.6
Wind Spd m/s : 7.4
Wind Dir deg : 230
Pre-Launch Note conditions not observable by automatic systems
Weather Description mostly sunny with convection occuring to the N and NE,
breezy with sudden gusts at times.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 46.1
Termination Altitude km : 21.482
Reason for Termination : lost signal
Post-Termination Weather Description: partly cloudy, convection to N and NE has
increased, cumulus clouds elsewhere
For Surface Data
Pressure mb : 1009.4
Temp C : 32.858
RH % : 74.104
Wspd m/s : 6.1391
Wdir deg : 213.49
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 180: DAILY, Site ISS3 (Bahia Kino), Mon 09-Aug-2004 16:55:06 GMT, Daily Report for August 9
All systems normal.
HE tanks:7 3/5
sondes:28
balloons:34
Profiler disk write:65.1%
voltage 134.4 on Ct4
Weather: mostly sunny skies with convection occuring througout the day to the
north, winds have picked up slightly, humid most of the day
- 179: SOUNDING, Site ISS3 (Bahia Kino), Mon 09-Aug-2004 16:53:54 GMT, Sounding Bahia Kino 9 August 18Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18Z
Sonde coef tape #: 408400706
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1011.49
Temp C : 34.46
RH % : 52.70
For Surface Data
Pressure mb : 1013.3
Temp C : 34.7
RH% : 53.4
Wind Spd m/s : 1.7
Wind Dir deg : 146
Pre-Launch Note conditions not observable by automatic systems
Weather Description: Cirrus to the SSE.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 53.2
Termination Altitude km : 20.498
Reason for Termination : sonde stopped transmitting data
Post-Termination Weather Description: Cumulus on the horizon to the ESE, cirrus to the south.
For Surface Data
Pressure mb : 1012.5
Temp C : 35.288
RH % : 54.169
Wspd m/s : 4.9386
Wdir deg : 220
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 178: SOUNDING, Site ISS3 (Bahia Kino), Mon 09-Aug-2004 10:46:37 GMT, Sounding Bahia Kino 9 August 1200z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408400600
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.98
Temp C : 29.31
RH % : 91.5
For Surface Data
Pressure mb :1009.8
Temp C : 29.9
RH% : 79.2
Wind Spd m/s : 1.5
Wind Dir deg : 136
Pre-Launch Note conditions not observable by automatic systems
Weather Description mostly clear, some alto stratus in patches, light
breeze, humid.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 73.9
Termination Altitude km : 18.426
Reason for Termination : lost signal
Post-Termination Weather Description: mostly clear with high stratus clouds to the east, alto stratus to the north with a few cumulus clouds to the north as
well, humid.
For Surface Data
Pressure mb : 1011
Temp C : 29.689
RH % : 83.663
Wspd m/s : 2.9083
Wdir deg :132.88
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
sonde relative humidity off again, waited for it to stabalize but did not. we still proceeded with the next launch screen and the ten second data did show relative humidity at around high 70's even though the raw data still had it around low 90's.
- 177: DAILY, Site ISS3 (Bahia Kino), Sun 08-Aug-2004 23:02:52 GMT, Daily Report for August 8
All systems normal.
HE tanks:8 4/5
sondes:31
balloons:37
Profiler disk write:61.6%
voltage 133.7 on Ct4
Weather:
lightning at night to the north east, today was clear and sunny with large
amounts of convection firing up to the north
- 176: SOUNDING, Site ISS3 (Bahia Kino), Sun 08-Aug-2004 22:45:06 GMT, Sounding Bahia Kino 9 August 0000z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408400602
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 106.35
Temp C : 32.89
RH % : 89.30
For Surface Data
Pressure mb :1008.7
Temp C : 33.8
RH% : 64.2
Wind Spd m/s : 6.1
Wind Dir deg : 225
Pre-Launch Note conditions not observable by automatic systems
Weather Description sunny and clear everywhere except to the north: large
amount of convection to the north
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 60.8
Termination Altitude km : 19.727
Reason for Termination : lost signal
Post-Termination Weather Description: sunny and clear, convection to north has
decreased, light breeze
For Surface Data
Pressure mb : 1007.5
Temp C : 32.766
RH % : 71.939
Wspd m/s : 5.4204
Wdir deg :228.61
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
sonde initial humidity data was off by more than 20 compared to surface data. we waited a while to see if it would stabalize but it did not. the rest of the
data was good so we launched the balloon.
recieved weak signal througout flight and only could be tracked with omni
antenna
- 175: SOUNDING, Site ISS3 (Bahia Kino), Sun 08-Aug-2004 10:51:44 GMT, Sounding Bahia Kino 8 August 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408400715
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.62
Temp C : 28.12
RH % : 81.80
For Surface Data
Pressure mb : 1009.2
Temp C : 28.0
RH% : 85.4
Wind Spd m/s : 1.5
Wind Dir deg : 52
Pre-Launch Note conditions not observable by automatic systems
Weather Description Dark with some clouds over head.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 46.8
Termination Altitude km : 21.199
Reason for Termination : Lost signal.
Post-Termination Weather Description: Mostly clear with alto cumulus to the NE.
For Surface Data
Pressure mb : 1010
Temp C : 27.145
RH % : 86.501
Wspd m/s : .80297
Wdir deg : 65.423
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 174: SOUNDING, Site ISS3 (Bahia Kino), Sun 08-Aug-2004 04:42:41 GMT, Sounding Bahia Kino 8 August 0600Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 6Z
Sonde coef tape #: 408400709
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1006.46
Temp C : 31.51
RH % : 75.9
For Surface Data
Pressure mb :1008.4
Temp C :31.5
RH% :75.9
Wind Spd m/s :4.1
Wind Dir deg : 225
Pre-Launch Note conditions not observable by automatic systems
Weather Description
clear overhead but cumulus towers and lightning to NE, light breeze
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 48.1
Termination Altitude km : 21.048
Reason for Termination : stopped transmitting data
Post-Termination Weather Description: humid, mostly cloudy, light breeze
For Surface Data
Pressure mb : 1009.4
Temp C : 30.871
RH % : 74.811
Wspd m/s : 4.607
Wdir deg : 202.54
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 173: SOUNDING, Site ISS3 (Bahia Kino), Sat 07-Aug-2004 22:50:31 GMT, Sounding Bahia Kino 8 August 0000Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408400601
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1004.91
Temp C : 33.21
RH % : 59.2
For Surface Data
Pressure mb : 1007.1
Temp C :33.4
RH% : 61.4
Wind Spd m/s :6.5
Wind Dir deg : 223
Pre-Launch Note conditions not observable by automatic systems
Weather Description
sunny, clear, light breeze with some convection to the north
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 48.6
Termination Altitude km : 21.121
Reason for Termination : sonde stopped transmitting data
Post-Termination Weather Description: Large cumulus towers building to the north,clear in all directions.
For Surface Data
Pressure mb : 1006.7
Temp C : 32.867
RH % : 65.397
Wspd m/s : 3.9978
Wdir deg : 216.88
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 172: DAILY, Site ISS3 (Bahia Kino), Sat 07-Aug-2004 16:52:14 GMT, Daily Report for August 7
All systems normal.
HE tanks:8 1/5
sondes:34
balloons:39
Profiler disk write:58.1%
voltage 132.2 on Ct4
Weather:
Clouds from this morning have cleared overhead,large convective tower building to the north
- 171: SOUNDING, Site ISS3 (Bahia Kino), Sat 07-Aug-2004 16:46:40 GMT, Sounding Bahia Kino 7 August 18Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18Z
Sonde coef tape #: 408401415
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.93
Temp C : 32.65
RH % : 57.10
For Surface Data
Pressure mb : 1011.3
Temp C : 32.3
RH% : 61.4
Wind Spd m/s : 1.8
Wind Dir deg : 148
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Clear and calm.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 27.7
Termination Altitude km : 24.6
Reason for Termination : lost signal
Post-Termination Weather Description: Cumulus towers building on the horizon to the WSW, a small batch of cirrus to the south, clear otherwise, winds have
picked up.
For Surface Data
Pressure mb : 1010.4
Temp C : 322.754
RH % : 66.219
Wspd m/s : 4.4698
Wdir deg : 236.94
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 170: SOUNDING, Site ISS3 (Bahia Kino), Sat 07-Aug-2004 10:48:02 GMT, Sounding Bahia Kino 7 August 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408401200
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.32
Temp C : 28.06
RH % : 87.6
For Surface Data
Pressure mb : 1010.5
Temp C : 28.0
RH% : 87.4
Wind Spd m/s : 2.7
Wind Dir deg : 92
Pre-Launch Note conditions not observable by automatic systems
Weather Description Dark, with cirrus clouds to the NE.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 57.4
Termination Altitude km : 19.931
Reason for Termination : Balloon burst.
Post-Termination Weather Description: Alto cumulus to the NE and NW.
For Surface Data
Pressure mb : 1010.6
Temp C : 27.498
RH % : 86.823
Wspd m/s : 1.6278
Wdir deg : 65.954
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 169: SOUNDING, Site ISS3 (Bahia Kino), Sat 07-Aug-2004 04:42:50 GMT, Sounding Bahia Kino 7 August 0600z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 6z
Sonde coef tape #: 408401312
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.64
Temp C : 29.66
RH % : 83.10
For Surface Data
Pressure mb :1011.2
Temp C : 29.5
RH% : 80.3
Wind Spd m/s : 3.8
Wind Dir deg : 221
Pre-Launch Note conditions not observable by automatic systems
Weather Description
some clouds, hard to see in the dark, light breeze
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb :45.0
Termination Altitude km :21.478
Reason for Termination : balloon burst
Post-Termination Weather Description: same as above
For Surface Data
Pressure mb : 1011.0
Temp C : 29.243
RH % : 82.316
Wspd m/s : 3.6417
Wdir deg : 184.21
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 168: SOUNDING, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 22:37:29 GMT, Sounding Bahia Kino 7 August 0000z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408401308
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.55
Temp C : 31.72
RH % : 64.10
For Surface Data
Pressure mb :1010.8
Temp C : 31.6
RH% : 66.2
Wind Spd m/s : 4.9
Wind Dir deg : 218
Pre-Launch Note conditions not observable by automatic systems
Weather Description thin blanket of stratocumulus clouds over most of sky,
light breeze
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 50.1
Termination Altitude km :19.984
Reason for Termination : Stopped transmitting data.
Post-Termination Weather Description:convection firing up to the north, thin
stratus layer to west, light breeze
For Surface Data
Pressure mb : 1009.7
Temp C : 30.284
RH % : 74.389
Wspd m/s : 5.0023
Wdir deg : 220.51
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 167: DAILY, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 16:55:42 GMT, Daily Report for August 6
All systems normal.
Power outage this morning. Clary is up and running again with the sounding computer hooked up to it.
HE tanks:8
sondes:38
balloons:43
Profiler disk write: 53.6%
Weather: Thunderstorm this morning at 12z launch. Overcast and cloudy today with a slight breeze.
- 166: SOUNDING, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 16:44:05 GMT, Sounding Bahia Kino 6 August 18z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18z
Sonde coef tape #: 408401303
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1011.49
Temp C : 30.27
RH % : 60.60
For Surface Data
Pressure mb : 1013.1
Temp C : 29.9
RH% : 63.1
Wind Spd m/s : 2.4
Wind Dir deg : 75
Pre-Launch Note conditions not observable by automatic systems
Weather Description Cumulus towers all around with a slight breeze.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 31.2
Termination Altitude km : 23.857
Reason for Termination : Stopped transmitting data.
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1013.1
Temp C : 32.659
RH % : 54.987
Wspd m/s : 1.9234
Wdir deg : 128.68
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 165: IMPORTANT IMPORTANT, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 11:06:25 GMT, Power Outage at 12z launch!
Short power outage this morning at 12z launch from storm. We had to restart the sounding system and bypass the clary as it started beeping at the very start of launch before we let the balloon go. We aborted the sonding, restarted the system without the clary and everything seems fine.
- 164: SOUNDING, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 10:49:00 GMT, Sounding Bahia Kino 6 August 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408414206
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1012.69
Temp C : 27.29
RH % : 84.7
For Surface Data
Pressure mb : 1013.7
Temp C : 26.7
RH% : 92.3
Wind Spd m/s : 10.3
Wind Dir deg : 141
Pre-Launch Note conditions not observable by automatic systems
Weather Description Warmer than usual this morning with more humidity, rain and strong gusty winds with lightning in the distance from all directions.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 83
Termination Altitude km : 17.708
Reason for Termination : Lost signal.
Post-Termination Weather Description: Storm now over with alto cumulus clouds in all directions.
For Surface Data
Pressure mb : 1011.8
Temp C : 28.967
RH % : 73.192
Wspd m/s : 3.0194
Wdir deg : 116.3
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 163: SOUNDING, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 04:53:28 GMT, Sounding Bahia Kino 6 August 0600z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0600z
Sonde coef tape #: 408401510
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.75
Temp C : 30.13
RH % : 79.5
For Surface Data
Pressure mb : 1010.8
Temp C : 30.0
RH% : 80.9
Wind Spd m/s : 3.4
Wind Dir deg : 222
Pre-Launch Note conditions not observable by automatic systems
Weather Description
clear skies with a light breeze
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 51.5
Termination Altitude km : 20.638
Reason for Termination : stopped transmitting data
Post-Termination Weather Description: light breeze and scattered cumulus clouds
For Surface Data
Pressure mb : 1010.8
Temp C : 29.882
RH % : 79.322
Wspd m/s : 3.0161
Wdir deg : 235.73
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 162: DAILY, Site ISS3 (Bahia Kino), Fri 06-Aug-2004 00:44:31 GMT, Daily Report for August 5
All systems normal.
we powered down after 12z launch this morning because the site power supply would be turned off for one hour from 7am to 8am. Before the 18z launch, we started the systems up again and everything worked fine.
the roving crew was here today for a couple of hours and will be back early next week.
HE tanks:9 2/5
sondes:42
balloons:47
Profiler disk write: 51.3%
Voltage:134.5
Weather: today has been mostly sunny with a variety of scattered clouds
througout the day but no significant weather
- 161: SOUNDING, Site ISS3 (Bahia Kino), Thu 05-Aug-2004 22:48:16 GMT, Sounding Bahia Kino 6 August 0000z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408401506
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.1
Temp C : 33.08
RH % : 61.6
For Surface Data
Pressure mb : 1010.1
Temp C : 33.2
RH% : 62.2
Wind Spd m/s : 4.8
Wind Dir deg : 221
Pre-Launch Note conditions not observable by automatic systems
Weather Description
sunny with some convection to the north
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 71.4
Termination Altitude km : 18.726
Reason for Termination : stopped transmitting data
Post-Termination Weather Description: sunny, thin layer of stratus to north, some convection to west
For Surface Data
Pressure mb : 1009.6
Temp C : 32.251
RH % : 69.193
Wspd m/s : 3.7348
Wdir deg : 229.63
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 160: IMPORTANT IMPORTANT, Site ISS3 (Bahia Kino), Thu 05-Aug-2004 16:51:52 GMT, Power Outage!
Power outage this morning from 6:00 am to 9:30 am. All system shut down before outage and all started up successfully.
- 159: SOUNDING, Site ISS3 (Bahia Kino), Thu 05-Aug-2004 16:48:17 GMT, Sounding Bahia Kino 5 August 18z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18z
Sonde coef tape #: 408414202
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1010.72
Temp C : 33.16
RH % : 54.10
For Surface Data
Pressure mb : 1012.8
Temp C : 32.5
RH% : 65.1
Wind Spd m/s : 3.5
Wind Dir deg : 120
Pre-Launch Note conditions not observable by automatic systems
Weather Description Alto cumulus to the N and stratus to E.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 32.7
Termination Altitude km : 23.526
Reason for Termination : balloon burst
Post-Termination Weather Description: sunny with scattered cumulus clouds
For Surface Data
Pressure mb : 1012.5
Temp C : 35.739
RH % : 46.331
Wspd m/s : 4.754
Wdir deg : 196.14
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 158: SOUNDING, Site ISS3 (Bahia Kino), Thu 05-Aug-2004 10:44:48 GMT, Sounding Bahia Kino 5 August 12z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408400713
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.10
Temp C : 29.07
RH % : 79.40
For Surface Data
Pressure mb : 1010.4
Temp C : 29.0
RH% : 79.0
Wind Spd m/s : 2.9
Wind Dir deg : 152
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 73.3
Termination Altitude km : 18.466
Reason for Termination : Stopped receiving data.
Post-Termination Weather Description: Strato cumulus clouds to the NE and NW.
For Surface Data
Pressure mb : 1011.4
Temp C : 27.911
RH % : 87.456
Wspd m/s : 2.2338
Wdir deg : 57.179
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 157: SOUNDING, Site ISS3 (Bahia Kino), Wed 04-Aug-2004 23:55:12 GMT, Sounding Bahia Kino 5 August 0000Z RE-LAUNCH
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0000Z
Sonde coef tape #:408401515
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1007.94
Temp C : 31.48
RH % : 72.80
For Surface Data
Pressure mb :1009.0
Temp C : 31.4
RH% : 74.3
Wind Spd m/s : 4.7
Wind Dir deg : 206
Pre-Launch Note conditions not observable by automatic systems
Weather Description
sunny with thin layers of stratocumulus clouds over some parts of the sky.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 92.2
Termination Altitude km : 17.197
Reason for Termination : sonde stopped transmitting data
Weather:mostly cloudy skies with a blanket of stratocumulus clouds over most of area, light breeze
For Surface Data
Pressure mb : 1009.0
Temp C : 30.407
RH % : 77.58
Wspd m/s : 4.5302
Wdir deg : 208.64
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Cycled the MotoSat laptop, Motosat, and powerstrip. Turned all off, waited a couple of minutes, powered up, phone and internet back up.
Balloon burst prematurely for the first sone,#408401411, at approx. 543.9mb. Launched second sonde at approx. 0030Z.
- 156: DAILY, Site ISS3 (Bahia Kino), Wed 04-Aug-2004 23:17:46 GMT, Daily Report for August 4
All systems normal.
Cycled Motostat, working fine now.
Launched second sonde at 0030Z because first one burst at 543.9mb,
see 00Z relaunch log.
ramon came by and told us they are going to turn off the power tomorrow from 7am to 8am. we will shut down the equipment and turn it back on around 8:15am
HE tanks:9 4/5
sondes:45
balloons:50
Profiler disk write: 48.6%
Voltage:134.8
Weather: this morning we saw clouds at all levels this can be shown by the
skew-t chart. they were stratus clouds at higher levels and cumulus and stratocumulus clouds at lower levels. mostly sunny the rest of today with thin layers ofstratocumulus randomly scattered when we first launched to thicker stratocumulusclouds moving in from the south by 0z.
sorry puerto penasco, but we have better seafood drive down and come visit
- 155: SOUNDING, Site ISS3 (Bahia Kino), Wed 04-Aug-2004 23:00:16 GMT, Sounding Bahia Kino 5 August 0000Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0000Z
Sonde coef tape #:408401411
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.50
Temp C : 32.10
RH % : 71.50
For Surface Data
Pressure mb :1009.4
Temp C : 32.4
RH% : 70.7
Wind Spd m/s : 5.4
Wind Dir deg : 215
Pre-Launch Note conditions not observable by automatic systems
Weather Description
sunny with thin layers of stratocumulus clouds over some parts of the sky.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : balloon burst at 543mb
Termination Altitude km :
Reason for Termination :
Weather:
For Surface Data
Pressure mb :
Temp C :
RH % :
Wspd m/s :
Wdir deg :
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Cycled the MotoSat laptop, Motosat, and powerstrip. Turned all off, waited a couple of minutes, powered up, phone and internet back up.
balloon burst at around 543.9mb will relaunch a new sonde.
- 154: SOUNDING, Site ISS3 (Bahia Kino), Wed 04-Aug-2004 10:55:15 GMT, Sounding Bahia Kino 4 August 12Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #:408401502
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.30
Temp C : 26.85
RH % : 71.70
For Surface Data
Pressure mb :1008.8
Temp C : 26.8
RH% : 72.6
Wind Spd m/s : 0.5
Wind Dir deg : 20
Pre-Launch Note conditions not observable by automatic systems
Weather Description
overcast, cool, calm winds
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 64.4
Termination Altitude km : 19.246
Reason for Termination : lost signal
Post-Termination Weather Description: Low level cumulus layer from the SE to the SW w/ a cumulostratus/stratus layer above in all directions, cool, a little more wind than at launch time.
For Surface Data
Pressure mb : 1009.7
Temp C : 27.241
RH % : 78.603
Wspd m/s : 1.7944
Wdir deg : 87.356
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 153: SOUNDING, Site ISS3 (Bahia Kino), Wed 04-Aug-2004 04:41:54 GMT, Sounding Bahia Kino 4 August 0600z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 6z
Sonde coef tape #: 408401503
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.57
Temp C : 30.93
RH % : 62.30
For Surface Data
Pressure mb : 1009.7
Temp C : 31.0
RH% : 60.1
Wind Spd m/s : 4.3
Wind Dir deg : 203
Pre-Launch Note conditions not observable by automatic systems
Weather Description Lightning off to the NNE.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 97.9
Termination Altitude km : 16.787
Reason for Termination : Lost signal.
Post-Termination Weather Description: Clouds moving in, temperatures cooling off
For Surface Data
Pressure mb : 1009.9
Temp C : 30.661
RH % : 57.798
Wspd m/s : 2.6764
Wdir deg : 182.71
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
First sonde we launched was bad, #408401511, no wind data up to termination pressure of 617 mb except for between 1009.6mb to 937.1 mb. The signal was good and the satellites were between 5-8 the whole flight. Launched another sonde, it also had missing wind data at the lower levels but improves with height. -Heather
- 152: DAILY, Site ISS3 (Bahia Kino), Tue 03-Aug-2004 23:55:42 GMT, Daily Report for August 2
All systems normal. Clary UPS malfunction this morning. We bypassed the Clary and plugged sounding system directly into tan box as per Lou's previous directionsEverything is running fine now.
12Z sonde had some problems tracking satellites this morning. Satellite service would come in and out with anywhere from 0 to 8 satellite coverage. The first sonde that we used at the 0Z launch had bad met data (Press:1211, Temp:114, RH:22)so we used another sonde for the launch.Sonde #408414100
HE tanks:11 1/5
sondes:53
balloons:58
Profiler disk write: 41.2%
Weather: Clear skies today with a slight breeze.
- 151: SOUNDING, Site ISS3 (Bahia Kino), Tue 03-Aug-2004 22:53:18 GMT, Sounding Bahia Kino 4 August 0Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 0Z
Sonde coef tape #: 408401407
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1005.98
Temp C : 33.60
RH % : 45.5
For Surface Data
Pressure mb : 1007.6
Temp C : 33.2
RH% : 47.8
Wind Spd m/s : 5.1
Wind Dir deg : 243
Pre-Launch Note conditions not observable by automatic systems
Weather Description
Cirrus to the south, cumulus towers to the NNE, clear overhead, temperature backup from last night's low of approximately 22-23 degrees C, nice while it lasted.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 67.8
Termination Altitude km : 19.071
Reason for Termination : lost signal
Post-Termination Weather Description: Scattered cirrus to the SSW and above, cumulus towers, slightly larger than at launch time, to the NNE.
For Surface Data
Pressure mb : 1007.1
Temp C : 33.016
RH % : 54.517
Wspd m/s : 4.282
Wdir deg : 235.78
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Restarted data manager at the beginning of launch because Cambell data not showing up, also paused Profiler briefly to do restart.
Clary seems to functioning fine.
- 150: SOUNDING, Site ISS3 (Bahia Kino), Tue 03-Aug-2004 16:44:59 GMT, Sounding Bahia Kino 3 August 1800z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 18z
Sonde coef tape #: 408401402
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.28
Temp C : 33.46
RH % : 41.9
For Surface Data
Pressure mb : 1010.8
Temp C : 33.2
RH% : 39.7
Wind Spd m/s : 2.3
Wind Dir deg : 75
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 34.1
Termination Altitude km : 23.266
Reason for Termination : Stopped receiving data.
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1010.2
Temp C : 35.296
RH % : 39.191
Wspd m/s : 3.1207
Wdir deg : 218.24
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Clary back up for this launch, seems to be fine. -H
- 149: SOUNDING, Site ISS3 (Bahia Kino), Tue 03-Aug-2004 10:49:23 GMT, Sounding Bahia Kino 3 August 1200z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 12z
Sonde coef tape #: 408401507
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.08
Temp C : 24.19
RH % : 911
For Surface Data
Pressure mb :1009.1
Temp C : 23.9
RH% : 91.5
Wind Spd m/s : 1
Wind Dir deg : 11
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 39.3
Termination Altitude km : 22.297
Reason for Termination : balloon burst
Post-Termination Weather Description: mare's tail clouds to the east, clear above, temp. cool and very pleasant.
For Surface Data
Pressure mb : 1009.5
Temp C : 21.738
RH % : 85.752
Wspd m/s : 2.8953
Wdir deg : 23.67
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 148: DAILY, Site ISS3 (Bahia Kino), Mon 02-Aug-2004 22:43:55 GMT, Daily Report for August 3
All systems normal. Clary back in system running fine.Suspect another brief power outage because Clary and data manager-Cambell display were both acting up, allis well now.Restarted data manager and paused profiler to get Cambell going again at the 0Z August 4 sounding.
4 sondes today
HE tanks:9 3/5
sondes:48
balloons:53
Profiler disk write: 44.7%
Voltage: 133.4 on Circuit #4
Weather: Cool this morning, in mid 20's, heating up to average temps., mid 30's,mostly clear skies with a few cirrus to the south and small cumulus towers building on the horizon to the NNE.
First 6Z sonde (408401511) launched only received wind data between 1009.6 to
937.1. Satellite coverage between 5 to 8 and signal in the 70's. Terminated at
617mb and launched a new one.Second sonde also had marginal wind data at the lower levels.
- 147: SOUNDING, Site ISS3 (Bahia Kino), Mon 02-Aug-2004 22:42:35 GMT, Sounding Bahia Kino 3 August 0z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name: Bahia Kino
launch time UTC: 0z
Sonde coef tape #: 408401514
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1008.41
Temp C : 32.18
RH % : 67.10
For Surface Data
Pressure mb :1010.1
Temp C : 32.6
RH% : 57.6
Wind Spd m/s : 5.5
Wind Dir deg : 207
Pre-Launch Note conditions not observable by automatic systems
Weather Description Clear skies with a slight breeze.
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 124.7
Termination Altitude km : 15.419
Reason for Termination : Lost signal.
Post-Termination Weather Description: Same as above.
For Surface Data
Pressure mb : 1009.4
Temp C : 31.996
RH % : 59.444
Wspd m/s : 4.1284
Wdir deg : 204.19
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
- 146: SOUNDING, Site ISS3 (Bahia Kino), Mon 02-Aug-2004 10:55:02 GMT, Sounding Bahia Kino 2 August 1200Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------
Site Name:Bahia Kino
launch time UTC: 12Z
Sonde coef tape #:408414211
------------------------------------------------------------------------------
MET INFO
-------- For Sonde
Pressure mb : 1009.29
Temp C : 27.71
RH % : 86.10
For Surface Data
Pressure mb :1010.7
Temp C : 27.7
RH% : 88.4
Wind Spd m/s : 5.0
Wind Dir deg : 129
Pre-Launch Note conditions not observable by automatic systems
Weather Description
mostly clear skies with a line of cumulus clouds to the south
------------------------------------------------------------------------------
POST TERMINATION
----------------
Termination Pressure mb : 33.9
Termination Altitude km : 23.219
Reason for Termination : lost signal
Post-Termination Weather Description: line of cumulus clouds from south has
moved in over area, also layer of stratocumulus clouds to the north and northeast
For Surface Data
Pressure mb : 1011.6
Temp C : 26.47
RH % : 84.681
Wspd m/s : 2.6225
Wdir deg : 93.432
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
sonde did not track satellites for parts of the launch so some wind data is
missing but most of it was received.
- 145: INFO, Site , Mon 02-Aug-2004 10:51:31 GMT, Clary UPS malfunction
When we tried to turn on the clary ups this morning, we realized it was not working so we removed the plug and plugged it into the protection box as told by
the roving crew on their last visit.
- 144: DAILY, Site ISS3 (Bahia Kino), Sun 01-Aug-2004 22:55:25 GMT, Daily Report for August 1
All systems normal.
3 sondes today
HE tanks: 11 2/5
sondes: 56
balloons:60
Profiler disk write: 37.7%
Voltage: 135.5 on circuit #4
Weather: Overcast layer has remained from this morning although thinner and w/fewer signs of convection, strong southerly breeze.
Ending IOP#5 w/0Z August 2 launch
2 sondes reporting unrealistic data at 6Z and 12Z on August 1, launched sondes were fine.
- 143: SOUNDING, Site ISS3 (Bahia Kino), Sun 01-Aug-2004 22:46:51 GMT, Sounding Bahia Kino 2 August 0Z
=====================
CLASS LAUNCH LOG version:951116
=====================
=========>> Enter data after all colons (:) <<===========
1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
--------------------------------------------------------------------------