name2004-iss2: Logbook

name2004-iss2: Chronological Logbook Entries


Return to Logbook Top Page
Entry Date Title Site Author #Graphics
194 Sun 15-Aug-2004Daily Report 15 Aug 2004ISS2 (Puerto Penasco)Victor
193 Sun 15-Aug-2004Sounding Launch #121; 15 Aug 2004 00:00zISS2 (Puerto Penasco)Victor
192 Sun 15-Aug-2004Sounding Launch #120; 15 Aug 2004 12:00zISS2 (Puerto Penasco)Conrad
191 Sun 15-Aug-2004Archive computer rebootConrad
190 Sat 14-Aug-2004Daily Report 14 Aug 2004ISS2 (Puerto Penasco)Conrad
189 Sat 14-Aug-2004Sounding Launch #119; 15 Aug 2004 00:00zISS2 (Puerto Penasco)Conrad
188 Sat 14-Aug-2004Sounding Launch #118; 2nd LAUNCH 14 Aug 2004 12:00zISS2 (Puerto Penasco)Mark
187 Sat 14-Aug-2004Sounding Launch #118; TERMINATED 14 Aug 2004 12:00z ISS2 (Puerto Penasco)Mark
186 Sat 14-Aug-2004Daily Report 13 Aug 2004ISS2 (Puerto Penasco)Mark
185 Fri 13-Aug-2004Sounding Launch #117; 14 Aug 2004 0:00zISS2 (Puerto Penasco)Mark
184 Fri 13-Aug-2004Sounding Launch #116; 13 Aug 2004 18:00zISS2 (Puerto Penasco)Mark
183 Fri 13-Aug-2004Sounding Launch #115; 13 Aug 2004 12:00zISS2 (Puerto Penasco)Conrad
182 Fri 13-Aug-2004Sounding Launch #114; 13 Aug 2004 06:00zISS2 (Puerto Penasco)Mark
181 Fri 13-Aug-2004Daily Report 12 Aug 2004ISS2 (Puerto Penasco)Victor
180 Thu 12-Aug-2004Sounding Launch #113; 13 Aug 2004 00:00z (IOP)ISS2 (Puerto Penasco)Victor
179 Thu 12-Aug-2004Sounding Launch #112; 12 Aug 2004 18:00z (IOP)ISS2 (Puerto Penasco)Mark
178 Thu 12-Aug-2004Sounding Launch #111; 12 Aug 2004 12:00z (IOP)ISS2 (Puerto Penasco)Victor
177 Thu 12-Aug-2004Sounding Launch #110; 12 Aug 2004 06:00z (IOP)ISS2 (Puerto Penasco)Mark
176 Wed 11-Aug-2004Daily Report 11 Aug 2004ISS2 (Puerto Penasco)Conrad
175 Wed 11-Aug-2004Sounding Launch #109; 12 Aug 2004 00:00z (IOP)ISS2 (Puerto Penasco)Conrad
174 Wed 11-Aug-2004Sounding Launch #108; 11 Aug 2004 18:00zISS2 (Puerto Penasco)Conrad
173 Wed 11-Aug-2004Sounding Launch #107; 11 Aug 2004 12:00zISS2 (Puerto Penasco)Mark
172 Wed 11-Aug-2004Daily Report 10 Aug 2004ISS2 (Puerto Penasco)Mark
171 Wed 11-Aug-2004Sounding Launch #106; 11 Aug 2004 6:00z (IOP)ISS2 (Puerto Penasco)Mark
170 Tue 10-Aug-2004Sounding Launch #105; 11 Aug 2004 00:00zISS2 (Puerto Penasco)Conrad
169 Tue 10-Aug-2004Satallite computer down 10 August 2004ISS2 (Puerto Penasco)Conrad
168 Tue 10-Aug-2004Sounding Launch #104; 10 Aug 2004 18:00zISS2 (Puerto Penasco)Conrad
167 Tue 10-Aug-2004Sounding Launch #103; 10 Aug 2004 12:00zISS2 (Puerto Penasco)Mark
166 Tue 10-Aug-2004Sounding Launch #102; 10 Aug 2004 06:00zISS2 (Puerto Penasco)Conrad
165 Tue 10-Aug-2004Profiler computer restart 10 August 2004 6:00 utc ISS2 (Puerto Penasco)Conrad
163 Mon 09-Aug-2004Daily Report 9 Aug 2004ISS2 (Puerto Penasco)Conrad
162 Mon 09-Aug-2004Sounding Launch #101; 10 Aug 2004 0:00z (IOP)ISS2 (Puerto Penasco)Mark
161 Mon 09-Aug-2004Sounding Launch #100; Aug 2004 18:00z (IOP)ISS2 (Puerto Penasco)Conrad
159 Mon 09-Aug-2004Sounding Launch #99; 9 Aug 2004 12:00zISS2 (Puerto Penasco)Conrad
158 Mon 09-Aug-2004Daily Report 8 Aug 2004ISS2 (Puerto Penasco)Conrad
157 Sun 08-Aug-2004Sounding Launch #98; 09 Aug 2004 00:00zISS2 (Puerto Penasco)Conrad
156 Sun 08-Aug-2004Roving Team Visit June & Lou.ISS2 (Puerto Penasco)Lou
155 Sun 08-Aug-2004Sounding Launch 97#; 09 Aug 2004 12:00zISS2 (Puerto Penasco)Conrad
154 Sun 08-Aug-2004Sounding Launch #96; 08 Aug 2004 6:00zISS2 (Puerto Penasco)Conrad
153 Sat 07-Aug-2004Daily Report 7 Aug 2004ISS2 (Puerto Penasco)Mark
152 Sat 07-Aug-2004Sounding Launch #95; 08 Aug 2004 0:00z (IOP)ISS2 (Puerto Penasco)Mark
151 Sat 07-Aug-2004Sounding Launch #94; 07 Aug 2004 18:00zISS2 (Puerto Penasco)Conrad
150 Sat 07-Aug-2004Sounding Launch #93; 07 Aug 2004 12:00z (IOP)ISS2 (Puerto Penasco)Mark
149 Sat 07-Aug-2004Sounding Launch #92; 7 Aug 2004 6:00z (IOP)ISS2 (Puerto Penasco)Conrad
148 Sat 07-Aug-2004Daily Report 6 Aug 2004ISS2 (Puerto Penasco)Mark
147 Fri 06-Aug-2004Sounding Launch #91; 07 Aug 2004 0:00z (IOP)ISS2 (Puerto Penasco)Mark
146 Fri 06-Aug-2004Sounding Launch #90; 06 Aug 2004 18:00z (IOP)ISS2 (Puerto Penasco)Mark
145 Fri 06-Aug-2004Sounding Launch #89; 6 Aug 2004 12:00z (IOP)ISS2 (Puerto Penasco)Mark
144 Fri 06-Aug-2004Sounding Launch #88; 6 Aug 2004 6:00z (IOP)ISS2 (Puerto Penasco)Victor
143 Fri 06-Aug-2004Daily Report 5 Aug 2004ISS2 (Puerto Penasco)Conrad
142 Thu 05-Aug-2004Sounding Launch #87; 6 Aug 2004 00:00z (IOP)ISS2 (Puerto Penasco)Conrad
141 Thu 05-Aug-2004Sounding Launch #86; 5 Aug 2004 18:00z (IOP)ISS2 (Puerto Penasco)Conrad
140 Thu 05-Aug-2004Sounding Launch #85; 5 Aug 2004 12:00z (IOP)ISS2 (Puerto Penasco)Victor
139 Wed 04-Aug-2004Daily Report 4 Aug 2004ISS2 (Puerto Penasco)Mark
138 Wed 04-Aug-2004Sounding Launch #84; 05 Aug 2004 0zISS2 (Puerto Penasco)Mark
137 Wed 04-Aug-2004Sounding Launch #83; 04 Aug 2004 12z ISS2 (Puerto Penasco)Mark
136 Wed 04-Aug-2004Sounding Launch #82; 04 Aug 2004 6z (IOP)ISS2 (Puerto Penasco)Mark
135 Wed 04-Aug-2004Daily Report 3 Aug 2004ISS2 (Puerto Penasco)Victor
134 Tue 03-Aug-2004Sounding Launch #81; 03 Aug 2004 23:00zISS2 (Puerto Penasco)Victor
133 Tue 03-Aug-2004Sounding Launch #80; 03 Aug 2004 18z (IOP)ISS2 (Puerto Penasco)Conrad
132 Tue 03-Aug-2004Sounding Launch #79; 03 Aug 2004 12:00zISS2 (Puerto Penasco)Conrad
131 Tue 03-Aug-2004Daily Report 2 Aug 2004ISS2 (Puerto Penasco)Conrad
130 Mon 02-Aug-2004Sounding Launch #78; 03 Aug 2004 0zISS2 (Puerto Penasco)Mark
129 Mon 02-Aug-2004Sounding Launch #77; 02 Aug 2004 12:00zISS2 (Puerto Penasco)Conrad
128 Sun 01-Aug-2004Daily Report 1 Aug 2004ISS2 (Puerto Penasco)Conrad
127 Sun 01-Aug-2004Sounding Launch #76; 02 Aug 2004 00:00zISS2 (Puerto Penasco)Conrad
126 Sun 01-Aug-2004Sounding Launch #75; 01 Aug 2004 18z (IOP)ISS2 (Puerto Penasco)Conrad
125 Sun 01-Aug-2004Sounding Launch #74; 01 Aug 2004 11z (IOP)ISS2 (Puerto Penasco)Victor
124 Sun 01-Aug-2004Sounding Launch #73; 01 Aug 2004 6z (IOP)ISS2 (Puerto Penasco)Mark
123 Sun 01-Aug-2004Daily Report 31 July 2004ISS2 (Puerto Penasco)Mark
122 Sat 31-Jul-2004Sounding Launch #72; 31 july 2004 23zISS2 (Puerto Penasco)Victor
121 Sat 31-Jul-2004Sounding Launch #71; 31 July 2004 12zISS2 (Puerto Penasco)Mark
120 Sat 31-Jul-2004Daily Report 30 July 2004ISS2 (Puerto Penasco)Mark
119 Fri 30-Jul-2004Sounding Launch #70; 31 July 2004 00:00zISS2 (Puerto Penasco)Conrad
118 Fri 30-Jul-2004Sounding Launch #69; 30 July 2004 12:00 utcISS2 (Puerto Penasco)Conrad
117 Fri 30-Jul-2004Daily Report 29 July 2004ISS2 (Puerto Penasco)Victor
116 Thu 29-Jul-2004Sounding Launch #68; 30 july 2004 0:00z ISS2 (Puerto Penasco)Victor
115 Thu 29-Jul-2004Sounding Launch #67; 29 July 2004 18:00 utc (IOP)ISS2 (Puerto Penasco)Conrad
114 Thu 29-Jul-2004Sounding Launch #66; 29 July 2004 11:00 utc (IOP)ISS2 (Puerto Penasco)Conrad
113 Thu 29-Jul-2004Sounding Launch #65; 29 July 2004 6:00 utc (IOP)ISS2 (Puerto Penasco)Conrad
112 Wed 28-Jul-2004Daily Report 28 July 2004ISS2 (Puerto Penasco)Conrad
111 Wed 28-Jul-2004Sounding Launch #64; 29 July 2004, 00:00 (IOP)ISS2 (Puerto Penasco)Conrad
110 Wed 28-Jul-2004Sounding Launch #63; 28 july 2004 18:00 (IOP)ISS2 (Puerto Penasco)Victor
109 Wed 28-Jul-2004Sounding Launch #62; 29 july 2004 6:00z (IOP)ISS2 (Puerto Penasco)Victor
108 Wed 28-Jul-2004Sounding Launch #61; 28 July 2004 6:00z (IOP)ISS2 (Puerto Penasco)Mark
107 Tue 27-Jul-2004Daily Report 27 July 2004ISS2 (Puerto Penasco)Mark
106 Tue 27-Jul-2004Sounding Launch #60; 2nd LAUNCH; 28 July 2004 0:00z (IOP)ISS2 (Puerto Penasco)Mark
105 Tue 27-Jul-2004Sounding Launch #60; TERMINATED; 28 July 2004 0:00z (IOP)ISS2 (Puerto Penasco)Mark
104 Tue 27-Jul-2004Sounding Launch #59; 27 July 2004 12:00zISS2 (Puerto Penasco)Mark
103 Tue 27-Jul-2004Daily Report 26 July 2004ISS2 (Puerto Penasco)Conrad
102 Mon 26-Jul-2004Sounding Launch #58; 27 july 2004 00:00zISS2 (Puerto Penasco)Victor
101 Mon 26-Jul-2004Sounding Launch #57; 26 July 2004 12:00zISS2 (Puerto Penasco)Conrad
100 Mon 26-Jul-2004Daily Report 25 July 2004ISS2 (Puerto Penasco)Mark
99 Sun 25-Jul-2004Sounding Launch #56; 26 July 2004 0:00zISS2 (Puerto Penasco)Mark
98 Sun 25-Jul-2004Sounding Launch #55; 25 July 2004 12:00zISS2 (Puerto Penasco)Mark
97 Sat 24-Jul-2004Coeff's for sondes 420711810 and 420711813ISS2 (Puerto Penasco)Conrad
96 Sat 24-Jul-2004Sounding Launch #54; 2nd LAUNCH; 24 July 2004 23:00zISS2 (Puerto Penasco)Conrad
95 Sat 24-Jul-2004Daily Report 24 July 2004ISS2 (Puerto Penasco)Conrad
94 Sat 24-Jul-2004Sounding Launch #54; TERMINATED 24 July 2004 23:00zISS2 (Puerto Penasco)Conrad
93 Sat 24-Jul-2004Sounding Launch #53; 24 July 2004 12:00zISS2 (Puerto Penasco)Conrad
92 Sat 24-Jul-2004Daily Report 23 July 2004ISS2 (Puerto Penasco)Conrad
91 Fri 23-Jul-2004Sounding Launch #52; 2nd LAUNCH; 23 July 2004 23:00zISS2 (Puerto Penasco)Conrad
90 Fri 23-Jul-2004Sounding Launch #52; TERMINATED; 23 july 2004 23:00zISS2 (Puerto Penasco)Hugo
89 Fri 23-Jul-2004Sounding Launch #51; 23 July 2004 12:00zISS2 (Puerto Penasco)Conrad
88 Thu 22-Jul-2004Daily Report 22 July 2004ISS2 (Puerto Penasco)Mark
87 Thu 22-Jul-2004Sounding Launch #50; 22 july 2004 23:00z (IOP)ISS2 (Puerto Penasco)Hugo
86 Thu 22-Jul-2004Sounding Launch #49; 22 July 2004 18:00z (IOP)ISS2 (Puerto Penasco)Conrad
85 Thu 22-Jul-2004Sounding Launch #48; 22 July 2004 12:00z (IOP)ISS2 (Puerto Penasco)Conrad
84 Thu 22-Jul-2004Sounding Launch #47; 22 July 2004 6:00z (IOP)ISS2 (Puerto Penasco)Mark
83 Thu 22-Jul-2004Daily Report 21 July 2004ISS2 (Puerto Penasco)Conrad
82 Wed 21-Jul-2004Sounding Launch #46; 21 july 2004 23:00z (IOP)ISS2 (Puerto Penasco)Hugo
81 Wed 21-Jul-2004Sounding Launch #45; 21 July 2004 18:00z (IOP)ISS2 (Puerto Penasco)Conrad
80 Wed 21-Jul-2004Sounding Launch #44; 21 July 2004 12:00z (IOP)ISS2 (Puerto Penasco)Mark
79 Wed 21-Jul-2004Daily Report 20 July 2004ISS2 (Puerto Penasco)Conrad
78 Wed 21-Jul-2004Sounding Launch #43; 21 July 6:00z (IOP)ISS2 (Puerto Penasco)Mark
77 Tue 20-Jul-2004Sounding Launch #42; 21 July 2004 0:00z (IOP)ISS2 (Puerto Penasco)Steve/John
76 Tue 20-Jul-2004IRT NotesISS2 (Puerto Penasco)Steve/John
75 Tue 20-Jul-2004Roving Crew Notes for 7/20/04ISS2 (Puerto Penasco)Steve/John
74 Tue 20-Jul-2004LNA VDC Supply OKISS2 (Puerto Penasco)Steve/John
73 Tue 20-Jul-2004Sounding Launch #41; 20 July 2004 18:00z (IOP)ISS2 (Puerto Penasco)Mark
72 Tue 20-Jul-2004Sounding Launch #40; 20 July 2004 12:00z (IOP)ISS2 (Puerto Penasco)Mark
71 Tue 20-Jul-2004Sounding Launch #39; 20 July 2004 6:00z (IOP)ISS2 (Puerto Penasco)Conrad
70 Tue 20-Jul-2004Daily Report 19 July 2004ISS2 (Puerto Penasco)Conrad
69 Mon 19-Jul-2004Sounding Launch #38; 19 july 2004 23:00 (IOP)ISS2 (Puerto Penasco)Hugo
68 Mon 19-Jul-2004PROFILER BACKUP AND DOWN TIMEISS2 (Puerto Penasco)Steve/John
67 Mon 19-Jul-2004Roving crew notes for July 19ISS2 (Puerto Penasco)Steve/John
66 Mon 19-Jul-2004Sounding Launch #37; 19 July 2004 12:00zISS2 (Puerto Penasco)Conrad
65 Mon 19-Jul-2004Daily Report 18 July 2004ISS2 (Puerto Penasco)Conrad
64 Sun 18-Jul-2004Sounding Launch #36; 18 july 2004 23:00zISS2 (Puerto Penasco)Hugo
63 Sun 18-Jul-2004Sounding Launch #35; 18 July 2004 12:00zISS2 (Puerto Penasco)Conrad
62 Sun 18-Jul-2004Daily Report 17 July 2004ISS2 (Puerto Penasco)Conrad
61 Sat 17-Jul-2004Sounding Launch #34; 17 July 2004 23:00z (IOP)ISS2 (Puerto Penasco)Hugo
60 Sat 17-Jul-2004Sounding Launch #33; 17 July 2004 12:00zISS2 (Puerto Penasco)Mark
59 Sat 17-Jul-2004Daily Report 16 July 2004ISS2 (Puerto Penasco)Mark
58 Fri 16-Jul-2004Sounding Launch #32; 17 July 2004 0zISS2 (Puerto Penasco)Mark
57 Fri 16-Jul-2004Sounding Launch #31; 16 July 2004 12:00zISS2 (Puerto Penasco)Conrad
56 Fri 16-Jul-2004Daily Report 15 July 2004ISS2 (Puerto Penasco)Conrad
55 Thu 15-Jul-2004Sounding Launch #30; 16 July 2002 00:00zISS2 (Puerto Penasco)Conrad
54 Thu 15-Jul-2004Sounding Launch #29; 15 july 2004 12:00z (IOP)ISS2 (Puerto Penasco)Hugo
53 Wed 14-Jul-2004Daily Report 14 July 2004ISS2 (Puerto Penasco)Conrad
51 Wed 14-Jul-2004Sounding Launch #28; 14 July 2004 23:00zISS2 (Puerto Penasco)Hugo
50 Wed 14-Jul-2004Sounding Launch #27; 14 July 2004 18:00z (IOP)ISS2 (Puerto Penasco)Conrad
49 Wed 14-Jul-2004Sounding Launch #26; 14 July 2004 12:00z (IOP)ISS2 (Puerto Penasco)Mark
48 Wed 14-Jul-2004Sounding Launch #25; 14 July 2004 6z (IOP)ISS2 (Puerto Penasco)Conrad
47 Wed 14-Jul-2004Daily Report 13 July 2004ISS2 (Puerto Penasco)Mark
46 Tue 13-Jul-2004Sounding Launch #24; 14 July 2004 0z (IOP)ISS2 (Puerto Penasco)Mark
45 Tue 13-Jul-2004Sounding Launch #23; 13 July 2004 18:00z (IOP)ISS2 (Puerto Penasco)Conrad
44 Tue 13-Jul-2004ASPEN update (Version 2.5.3) 12:00 utc 13 July 2004ISS2 (Puerto Penasco)Conrad
43 Tue 13-Jul-2004Sounding Launch #22; 13 July 2004 12:00z (IOP)ISS2 (Puerto Penasco)Mark
42 Tue 13-Jul-2004Sounding Launch #21; 13 July 2004 6:00z (IOP)ISS2 (Puerto Penasco)Conrad
41 Tue 13-Jul-2004Daily Report 12 July 2004ISS2 (Puerto Penasco)Mark
40 Mon 12-Jul-2004Sounding Launch #20; 13 July 2004 0:00z (IOP)ISS2 (Puerto Penasco)Mark
35 Mon 12-Jul-2004Sounding Launch #19; 12 July 2004 18:00Z (IOP)ISS2 (Puerto Penasco)Mark
34 Mon 12-Jul-2004Sounding Launch #18; 2ND LAUNCH; 12 July 2004 12:00z (IOP)ISS2 (Puerto Penasco)Conrad
33 Mon 12-Jul-2004Sounding Launch #18; TERMINATED; 12:00 utc, 12 July 2004 (IOP)ISS2 (Puerto Penasco)Conrad
32 Mon 12-Jul-2004Sounding Launch #17; 12 July 2004 6Z (IOP)ISS2 (Puerto Penasco)Mark
31 Mon 12-Jul-2004Daily Report 11 July 2004ISS2 (Puerto Penasco)Mark
30 Sun 11-Jul-2004Sounding Launch #16; 12 July 2004 0:00Z (IOP)ISS2 (Puerto Penasco)Mark
29 Sun 11-Jul-2004Sounding Launch #15; 11 July 2004 12:00zISS2 (Puerto Penasco)Conrad
28 Sun 11-Jul-2004Daily Report 10 July 2004ISS2 (Puerto Penasco)Mark
27 Sat 10-Jul-2004Sounding Launch #14; SECOND LAUNCH; 10 July 2004 23:00zISS2 (Puerto Penasco)Conrad
25 Sat 10-Jul-2004Sounding Launch #14; TERMINATED; 10 July 2004 23:00zISS2 (Puerto Penasco)Conrad
24 Sat 10-Jul-2004Sounding Launch #13; 10 July 2004 11:00zISS2 (Puerto Penasco)Conrad
23 Sat 10-Jul-2004Sounding Launch #12; 9 July 2004 6:00z (I0P)ISS2 (Puerto Penasco)Hugo
22 Sat 10-Jul-2004Daily Report 09 July 2004ISS2 (Puerto Penasco)Hugo
21 Fri 09-Jul-2004Sounding Launch #11; 10 July 2004 0:00Z IOPISS2 (Puerto Penasco)Mark
20 Fri 09-Jul-2004Sounding Launch #10; 04 july 09 ISS2 (Puerto Penasco)Victor
19 Fri 09-Jul-2004Sounding Launch #09; 9 July 2004 12:00zISS2 (Puerto Penasco)Victor
18 Fri 09-Jul-2004Profiler RX/TX adjustmentsISS2 (Puerto Penasco)Bill
17 Fri 09-Jul-2004Sounding Launch #08; 09 July 2004 6:00Z (IOP)ISS2 (Puerto Penasco)Mark
16 Fri 09-Jul-2004Daily Report 08 July 2004ISS2 (Puerto Penasco)Conrad
15 Thu 08-Jul-2004Sounding Launch #07; 8 July 2004 23:00z (IOP)ISS2 (Puerto Penasco)Conrad
14 Thu 08-Jul-2004Sounding Launch #06; 8 July 2004 18:00Z (IOP)ISS2 (Puerto Penasco)Victor
13 Thu 08-Jul-2004Sounding Launch #05; 08 July 2004 12:00z (IOP) ISS2 (Puerto Penasco)Conrad
12 Thu 08-Jul-2004Sounding Launch #04; 08 July 2004 5:00Z (IOP)ISS2 (Puerto Penasco)Hugo
11 Thu 08-Jul-2004Daily Report 07 July 2004ISS2 (Puerto Penasco)Mark
10 Wed 07-Jul-2004Sounding Launch #03; 7 july 2004 00:00z (IOP)ISS2 (Puerto Penasco)Victor
9 Wed 07-Jul-2004Training PowerdownISS2 (Puerto Penasco)Conrad
8 Wed 07-Jul-2004Sounding Launch #02; 07 July 2004 17:00ZISS2 (Puerto Penasco)Mark
7 Wed 07-Jul-2004Sounding Launch #01; 7 July 2004, 11:00ZISS2 (Puerto Penasco)Victor
6 Wed 07-Jul-2004Profiler directionsISS2 (Puerto Penasco)Bill
5 Wed 07-Jul-2004Surface temperature/rh fan ISS2 (Puerto Penasco)Bill
4 Tue 06-Jul-2004Daily Report 06 July 2004ISS2 (Puerto Penasco)Operator
3 Tue 06-Jul-2004Surface Met Serial NumbersISS2 (Puerto Penasco)Bill
2 Tue 27-Jun-2000Sounding Launch #; Aug 2004 :00zISS2 (Puerto Penasco)Conrad
1 Tue 11-Apr-2000Logbook creatednoneiss


194: DAILY, Site ISS2 (Puerto Penasco), Sun 15-Aug-2004 22:48:12 GMT, Daily Report 15 Aug 2004
Daily Report 15 August 2004

Sondes launched at 11:00, 23:00.  All launches successful.

all systems and equipment are working well

Profiler disk space: 38.4%

Balloons remaining: 16
Sondes remaining: 10
He tanks remaining: 8

Weather: clear except for large cumulonimbus to North.

today we are gone a shutdown of all systems
see you lather, have a nice day





















193: SOUNDING, Site ISS2 (Puerto Penasco), Sun 15-Aug-2004 22:37:00 GMT, Sounding Launch #121; 15 Aug 2004 00:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040815
launch time UTC: 22:37
Sonde coef tape #: 408403415

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1005.79
Temp C		: 35.37
RH %		: 40.60

		For Surface Data
Pressure mb	: 1007.0 
Temp C		: 35.4
RH%		: 41.3
Wind Spd m/s	: 4.7
Wind Dir deg	: 200

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

moderate breeze, cumulonibus clouds all around, clear
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 116.8
Termination Altitude km	: 15.7
Reason for Termination	: finished

Post-Termination Weather Description: clear with some hight clouds and moderate breze

For Surface Data
		Pressure mb	: 1006.8
     		Temp C		: 34.02
		RH %		: 43.95
		Wspd m/s 	: 4.19
		Wdir deg	: 220.92
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------


35 cuft He

Victor 


















192: SOUNDING, Site ISS2 (Puerto Penasco), Sun 15-Aug-2004 11:14:45 GMT, Sounding Launch #120; 15 Aug 2004 12:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 0408
launch time UTC: 11:25
Sonde coef tape #: 408403704

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.3
Temp C		: 26.1
RH %		: 83

		For Surface Data
Pressure mb	: 1008.6
Temp C		: 26.0
RH%		: 85.0
Wind Spd m/s	: 1.9
Wind Dir deg	: 115

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

calm, clear
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 
Termination Altitude km	: 
Reason for Termination	: 

Post-Termination Weather Description: 

For Surface Data
		Pressure mb	: 
     		Temp C		: 
		RH %		: 
		Wspd m/s 	: 
		Wdir deg	: 
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------


35 cuft He

Mark, Conrad














191: INFO, Site , Sun 15-Aug-2004 02:15:39 GMT, Archive computer reboot
Archive computer reboot 15 Aug 2004, 2:14 utc
190: DAILY, Site ISS2 (Puerto Penasco), Sat 14-Aug-2004 23:15:26 GMT, Daily Report 14 Aug 2004
Daily Report 14 August 2004

Sondes launched at 11:00, 23:00.  All launches successful.

Profiler disk space: 34.7%

Balloons remaining: 20
Sondes remaining: 14
He tanks remaining: 10

Weather: clear except for large cumulonimbus to North.



















189: SOUNDING, Site ISS2 (Puerto Penasco), Sat 14-Aug-2004 23:01:42 GMT, Sounding Launch #119; 15 Aug 2004 00:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040814
launch time UTC: 23:15
Sonde coef tape #: 408403412

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.0
Temp C		: 34.1
RH %		: 41.7

		For Surface Data
Pressure mb	: 10080
Temp C		: 34.8
RH%		: 39.0
Wind Spd m/s	: 7.0
Wind Dir deg	: 222

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

slight breeze, clear, large cumulonibus cloud to north
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 77.8
Termination Altitude km	: 18.1
Reason for Termination	: finished

Post-Termination Weather Description: scattered high clouds, slight breeze

For Surface Data
		Pressure mb	: 1007.3
     		Temp C		: 33.0
		RH %		: 51.8
		Wspd m/s 	: 6.1
		Wdir deg	: 244.3
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight

35 cuft He

Mark, Conrad















188: SOUNDING, Site ISS2 (Puerto Penasco), Sat 14-Aug-2004 11:12:37 GMT, Sounding Launch #118; 2nd LAUNCH 14 Aug 2004 12:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040814
launch time UTC: 11:15
Sonde coef tape #: 408403300

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.5
Temp C		: 26.8
RH %		: 54.6

		For Surface Data
Pressure mb	: 1009.3
Temp C		: 26.6
RH%		: 58.2
Wind Spd m/s	: 3.0
Wind Dir deg	: 18

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

clear and a slight breeze
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 89.0
Termination Altitude km	: 17.3
Reason for Termination	: done

Post-Termination Weather Description: 
clear,
For Surface Data
		Pressure mb	: 1009.6
     		Temp C		: 26.17
		RH %		: 57.71
		Wspd m/s 	: 3.16
		Wdir deg	: 42.64
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
2nd LAUNCH

35 cu ft He, good flaight
no wind in last 5 mb
Victor and Mark


















187: SOUNDING, Site ISS2 (Puerto Penasco), Sat 14-Aug-2004 10:50:38 GMT, Sounding Launch #118; TERMINATED 14 Aug 2004 12:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040814
launch time UTC: 11:15
Sonde coef tape #: 408403411

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 
Temp C		: 
RH %		: 

		For Surface Data
Pressure mb	: 
Temp C		: 
RH%		: 
Wind Spd m/s	: 
Wind Dir deg	: 

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 
Termination Altitude km	: 
Reason for Termination	: 

Post-Termination Weather Description: 

For Surface Data
		Pressure mb	: 
     		Temp C		: 
		RH %		: 
		Wspd m/s 	: 
		Wdir deg	: 
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

Screw to change the frequency broke off and so wasn't able to get a good signal


















186: DAILY, Site ISS2 (Puerto Penasco), Sat 14-Aug-2004 00:20:50 GMT, Daily Report 13 Aug 2004
Daily Report 13 August 2004

Sondes launched at 11:00, 18:00, 23:00, 5:00 UTC. All launches successful.

satellite computer still down.

Profiler disk space: 31.6%

Balloons remaining: 22
Sondes remaining: 17
He tanks remaining: 10

Weather: clear except for large cumulus tower line stretching from North to East horizon which formed during early afternoon hours

Today we had the sushi buffet at a local Japanese restaurant

It's Friday the 13th!
















185: SOUNDING, Site ISS2 (Puerto Penasco), Fri 13-Aug-2004 22:37:55 GMT, Sounding Launch #117; 14 Aug 2004 0:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040813
launch time UTC: 23:00
Sonde coef tape #: 408403404

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1002.9
Temp C		: 36.09
RH %		: 44.6

		For Surface Data
Pressure mb	: 1007.1
Temp C		: 35.3
RH%		: 43.0
Wind Spd m/s	: 3.7
Wind Dir deg	: 182

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

clear skies above, but a whole line of rising cumulus towers exists from the 
North to East horizon


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 68.9
Termination Altitude km	: 18.8
Reason for Termination	: done

Post-Termination Weather Description: clear with same rising cumulus tower line stretching from the West to East

For Surface Data
		Pressure mb	: 1006.9
     		Temp C		: 35.0
		RH %		: 42.0
		Wspd m/s 	: 3.0
		Wdir deg	: 172
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight
35 cu ft. He
Mark and Victor


















184: SOUNDING, Site ISS2 (Puerto Penasco), Fri 13-Aug-2004 16:47:53 GMT, Sounding Launch #116; 13 Aug 2004 18:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040813
launch time UTC: 17:00
Sonde coef tape #: 408403609

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.7
Temp C		: 33.7
RH %		: 54.4

		For Surface Data
Pressure mb	: 1011.0
Temp C		: 33.8
RH%		: 57.5
Wind Spd m/s	: 3.2
Wind Dir deg	: 138

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

clear and warm, light wind

clear, slight breeze
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 73.3
Termination Altitude km	: 18.5
Reason for Termination	: finished

Post-Termination Weather Description: moderate breeze, clear

For Surface Data
		Pressure mb	: 1010.5
     		Temp C		: 35.3
		RH %		: 47.0
		Wspd m/s 	: 5.1
		Wdir deg	: 173.5
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight

35 cu ft. He

Mark and Conrad
















183: SOUNDING, Site ISS2 (Puerto Penasco), Fri 13-Aug-2004 11:09:26 GMT, Sounding Launch #115; 13 Aug 2004 12:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040813
launch time UTC: 11:15
Sonde coef tape #: 408403601

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.1
Temp C		: 28.15
RH %		: 85.5

		For Surface Data
Pressure mb	: 1008.5
Temp C		: 28.0
RH%		: 77.8
Wind Spd m/s	: 2.8
Wind Dir deg	: 56

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

calm, clear
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 52
Termination Altitude km	: 20.5
Reason for Termination	: finished

Post-Termination Weather Description: clam, clear

For Surface Data
		Pressure mb	: 1008.8
     		Temp C		: 28.5
		RH %		: 75.5
		Wspd m/s 	: 3.4
		Wdir deg	: 102.4
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight

33 cuft He

Conrad















182: SOUNDING, Site ISS2 (Puerto Penasco), Fri 13-Aug-2004 04:46:35 GMT, Sounding Launch #114; 13 Aug 2004 06:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040813
launch time UTC: 5:10
Sonde coef tape #: 408403600

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.77
Temp C		: 31.36
RH %		: 62.5

		For Surface Data
Pressure mb	: 1008.4
Temp C		: 31.3
RH%		: 63.9
Wind Spd m/s	: 1.1
Wind Dir deg	: 220

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

clear skies with a great night for viewing the meteor shower


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 86.2
Termination Altitude km	: 17.5
Reason for Termination	: done

Post-Termination Weather Description: clear skies

For Surface Data
		Pressure mb	: 1008.5
     		Temp C		: 29.50
		RH %		: 67.33
		Wspd m/s 	: .9695
		Wdir deg	: 306.07
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight, 35 cu ft He

Mark and Victor


















181: DAILY, Site ISS2 (Puerto Penasco), Fri 13-Aug-2004 00:22:26 GMT, Daily Report 12 Aug 2004
Daily Report 12 August 2004

Sondes launched at 11:00, 18:00, 23:00, 5:00 UTC. All launches successful.

satallite computer still down.

Profiler disk space: 28.0%

Balloons remaining: 26
Sondes remaining: 21
He tanks remaining: 11

Weather: mostly clear throughout day
with some clouds


















180: SOUNDING, Site ISS2 (Puerto Penasco), Thu 12-Aug-2004 22:30:53 GMT, Sounding Launch #113; 13 Aug 2004 00:00z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040812
launch time UTC: 22.30
Sonde coef tape #: 408403611

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006
Temp C		: 36.7
RH %		: 38.8

		For Surface Data
Pressure mb	: 1007.9
Temp C		: 36.0
RH%		: 41.1
Wind Spd m/s	: 4.1
Wind Dir deg	: 200

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
moderate  breeze, some mid clouds from NE And SW, 


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 74.0
Termination Altitude km	: 18.4
Reason for Termination	: finished

Post-Termination Weather Description:  moderate breeze, sunny, some clouds

For Surface Data
		Pressure mb	: 1006.9
     		Temp C		: 35.04
		RH %		: 41.03
		Wspd m/s 	: 5.04
		Wdir deg	: 193.92
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight, 
35 cu ft. He
Mark and Victor






















179: SOUNDING, Site ISS2 (Puerto Penasco), Thu 12-Aug-2004 16:57:45 GMT, Sounding Launch #112; 12 Aug 2004 18:00z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040812
launch time UTC: 17:15
Sonde coef tape #: 408403414

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.3
Temp C		: 33.45
RH %		: 65.6

		For Surface Data
Pressure mb	: 1011.7
Temp C		: 33.8
RH%		: 52.9
Wind Spd m/s	: 5.2
Wind Dir deg	: 139

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

clear skies, but a few clouds to the North.  moderate breezes

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 77.2
Termination Altitude km	: 18.2
Reason for Termination	: finished

Post-Termination Weather Description: scattered clouds moderate breeze

For Surface Data
		Pressure mb	: 1011
     		Temp C		: 33.9
		RH %		: 51.7
		Wspd m/s 	: 5.4
		Wdir deg	: 160.5
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight, no winds last 100mb
35 cu ft. He
Mark and Conrad



















178: SOUNDING, Site ISS2 (Puerto Penasco), Thu 12-Aug-2004 10:54:28 GMT, Sounding Launch #111; 12 Aug 2004 12:00z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040812
launch time UTC: 11:00
Sonde coef tape #: 408403712

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.7
Temp C		: 30.7
RH %		: 62.0

		For Surface Data
Pressure mb	: 1006.8
Temp C		: 30.7
RH%		: 60.8
Wind Spd m/s	: 3.2
Wind Dir deg	: 156

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
clear skies overhead, with some clouds from NE   
moderate breeze 

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 75.0
Termination Altitude km	: 18.2
Reason for Termination	: done

Post-Termination Weather Description: 
  some clouds, mod breeze, 

For Surface Data
		Pressure mb	: 1007.6
     		Temp C		: 29.51
		RH %		: 71.31
		Wspd m/s 	: 3.00
		Wdir deg	: 172.75
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------


good flight, but can't transfer data due to satellite being down here

35 cu ft. He

conrad and Victor























177: SOUNDING, Site ISS2 (Puerto Penasco), Thu 12-Aug-2004 04:50:25 GMT, Sounding Launch #110; 12 Aug 2004 06:00z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040812
launch time UTC: 5:00
Sonde coef tape #: 408403613

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.1
Temp C		: 30.4
RH %		: 73.1

		For Surface Data
Pressure mb	: 1008.1
Temp C		: 30.4
RH%		: 72.1
Wind Spd m/s	: 2.6
Wind Dir deg	: 135

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
clear skies overhead with a beautiful cloud to cloud lightning show to the 
Northeast

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 93.3
Termination Altitude km	: 17.0
Reason for Termination	: done

Post-Termination Weather Description: partly cloudy as clouds from the 
cumulunimbus clouds and lightning show to our northeast are now overhead.  Lots of lightning still happening to the northeast

For Surface Data
		Pressure mb	: 1009.2
     		Temp C		: 29.29
		RH %		: 75.25
		Wspd m/s 	: 2.8
		Wdir deg	: 22
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
great evening lightning show to the north

good flight, but can't transfer data due to satellite being down here

35 cu ft. He

Mark and Victor



















176: DAILY, Site ISS2 (Puerto Penasco), Wed 11-Aug-2004 23:16:19 GMT, Daily Report 11 Aug 2004
Daily Report 11 August 2004

Sondes launched at 11:00, 18:00, 23:00, 5:00 UTC. All launches successful.

satallite computer still down.

Profiler disk space: 24.3%

Balloons remaining: 30
Sondes remaining: 25
He tanks remaining: 11

Weather: mostly clear throughout day

















175: SOUNDING, Site ISS2 (Puerto Penasco), Wed 11-Aug-2004 22:54:53 GMT, Sounding Launch #109; 12 Aug 2004 00:00z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040811
launch time UTC: 23:10
Sonde coef tape #: 408403604

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.0
Temp C		: 34.7
RH %		: 52.4

		For Surface Data
Pressure mb	: 1006.9
Temp C		: 34.6
RH%		: 50.3
Wind Spd m/s	: 5.5
Wind Dir deg	: 192

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

clear skies and sea breeze


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 70.0
Termination Altitude km	: 18.8
Reason for Termination	: lost signal

Post-Termination Weather Description: clear with cumulus clouds building to 
Northeast, sea breeze

For Surface Data
		Pressure mb	: 1005.8
     		Temp C		: 34.0
		RH %		: 51.3
		Wspd m/s 	: 4.2
		Wdir deg	: 189
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight, can't send data electronically due to sattelite computer being down

35 cu ft. He

Mark, Conrad















174: SOUNDING, Site ISS2 (Puerto Penasco), Wed 11-Aug-2004 16:57:35 GMT, Sounding Launch #108; 11 Aug 2004 18:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040811
launch time UTC: 17:00
Sonde coef tape #: 408403606

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.1
Temp C		: 34.0
RH %		: 76.9

		For Surface Data
Pressure mb	: 1010.2
Temp C		: 33.2
RH%		: 63.9
Wind Spd m/s	: 7.2
Wind Dir deg	: 163

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

clear, moderate breeze
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 83.7
Termination Altitude km	: 17.7
Reason for Termination	: finished

Post-Termination Weather Description: clear, moderate breeze

For Surface Data
		Pressure mb	: 1009.7
     		Temp C		: 34.11
		RH %		: 58.56
		Wspd m/s 	: 6.40
		Wdir deg	: 171.16
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
 we lost information in raw wind data at  press 117mb, no satellites, otherwise good launch


35 cu ft He
Victor,Conrad


















173: SOUNDING, Site ISS2 (Puerto Penasco), Wed 11-Aug-2004 10:43:24 GMT, Sounding Launch #107; 11 Aug 2004 12:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040811
launch time UTC: 11:00
Sonde coef tape #: 408403708

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.6
Temp C		: 29.6
RH %		: 83.6

		For Surface Data
Pressure mb	: 1008.0
Temp C		: 29.5
RH%		: 84.1
Wind Spd m/s	: 2.1
Wind Dir deg	: 135

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

clear skies with a slight breeze


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 79.9
Termination Altitude km	: 17.8
Reason for Termination	: finished

Post-Termination Weather Description: clear skies and calm winds

For Surface Data
		Pressure mb	: 1008.2
     		Temp C		: 27.52
		RH %		: 83.8
		Wspd m/s 	: 1.9
		Wdir deg	: 95
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight, but data not available for real time transfer due to satellite 
problems here

35 cu. ft. He

Mark and Conrad
















172: DAILY, Site ISS2 (Puerto Penasco), Wed 11-Aug-2004 04:47:54 GMT, Daily Report 10 Aug 2004
Daily Report 10 August 2004

Sondes launched at 11:00, 18:00, 23:00, 5:00 UTC. All launches successful.

Satellite computer down today after 18z launch, no data is being transfered or 
sent real time.  Launch data is saved on computer hard drive

Profiler disk space: 21.4%

Balloons remaining: 33
Sondes remaining: 28
He tanks remaining: 12

Weather: mostly clear today and humid in the morning and evening



















171: SOUNDING, Site ISS2 (Puerto Penasco), Wed 11-Aug-2004 04:33:27 GMT, Sounding Launch #106; 11 Aug 2004 6:00z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040811
launch time UTC: 5:00
Sonde coef tape #: 408403406

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.8
Temp C		: 30.33
RH %		: 90.30

		For Surface Data
Pressure mb	: 1008.5
Temp C		: 30.4
RH%		: 76.4
Wind Spd m/s	: 2.0
Wind Dir deg	: 152

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

clear skies, a few lightning strikes to the Northeast.


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 81.7
Termination Altitude km	: 17.8
Reason for Termination	: balloon popped

Post-Termination Weather Description: humid and clear

For Surface Data
		Pressure mb	: 1008.5
     		Temp C		: 30.1
		RH %		: 79.2
		Wspd m/s 	: 2.5
		Wdir deg	: 128
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Can't transfer or email the data in real time because of satellite problems

good flight

35 cu ft. He

Mark and Victor


















170: SOUNDING, Site ISS2 (Puerto Penasco), Tue 10-Aug-2004 23:01:49 GMT, Sounding Launch #105; 11 Aug 2004 00:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040810
launch time UTC: 23:00
Sonde coef tape #: 408403400

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.4
Temp C		: 33.7
RH %		: 52.9

		For Surface Data
Pressure mb	: 1006.9
Temp C		: 33.9
RH%		: 54.2
Wind Spd m/s	: 7.1
Wind Dir deg	: 223

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

clear, moderate breeze
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 57.1
Termination Altitude km	: 20.0
Reason for Termination	: finished

Post-Termination Weather Description: clear, moderate breeze

For Surface Data
		Pressure mb	: 1007.0
     		Temp C		: 33.0
		RH %		: 56.6
		Wspd m/s 	: 5.5
		Wdir deg	: 190.3
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight

35 cuft He

Victor, Conrad















169: IMPORTANT IMPORTANT, Site ISS2 (Puerto Penasco), Tue 10-Aug-2004 20:50:14 GMT, Satallite computer down 10 August 2004

168: SOUNDING, Site ISS2 (Puerto Penasco), Tue 10-Aug-2004 16:54:45 GMT, Sounding Launch #104; 10 Aug 2004 18:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040810
launch time UTC: 17:15
Sonde coef tape #: 420711504

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.3
Temp C		: 33.6
RH %		: 48.8

		For Surface Data
Pressure mb	: 1011.1
Temp C		: 34.0
RH%		: 54.8
Wind Spd m/s	: 4.0
Wind Dir deg	: 145

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

moderate breeze, clear
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 90.6
Termination Altitude km	: 17.2
Reason for Termination	: finished

Post-Termination Weather Description: clear, moderate breeze

For Surface Data
		Pressure mb	: 1010.6
     		Temp C		: 35.3
		RH %		: 50.3
		Wspd m/s 	: 5.5
		Wdir deg	: 171.6
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight

35 cuft He

Conrad, Victor














167: SOUNDING, Site ISS2 (Puerto Penasco), Tue 10-Aug-2004 10:34:53 GMT, Sounding Launch #103; 10 Aug 2004 12:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040810
launch time UTC: 11:00
Sonde coef tape #: 420711508

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.72
Temp C		: 27.0
RH %		: 84.0

		For Surface Data
Pressure mb	: 1007.9
Temp C		: 27.0
RH%		: 88.7
Wind Spd m/s	: 2.7
Wind Dir deg	: 66

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

clear and very humid


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 85.1
Termination Altitude km	: 17.5
Reason for Termination	: finished

Post-Termination Weather Description: clear and humid still

For Surface Data
		Pressure mb	: 1009.1
     		Temp C		: 27.2
		RH %		: 88.1
		Wspd m/s 	: 2.9
		Wdir deg	: 110
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight, no good wind data after about 250mb

35 cu ft. He
Mark and Victor


















166: SOUNDING, Site ISS2 (Puerto Penasco), Tue 10-Aug-2004 09:44:57 GMT, Sounding Launch #102; 10 Aug 2004 06:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040810
launch time UTC: 5:00
Sonde coef tape #: 420711509

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.2
Temp C		: 30.4
RH %		: 65.1

		For Surface Data
Pressure mb	: 1008.3
Temp C		: 30.2
RH%		: 72.7
Wind Spd m/s	: 1.3
Wind Dir deg	: 19

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

calm, clear
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 81.4
Termination Altitude km	: 17.9
Reason for Termination	: finished

Post-Termination Weather Description: calm, clear

For Surface Data
		Pressure mb	: 1008.6
     		Temp C		: 29.9
		RH %		: 70.6
		Wspd m/s 	: 1.7
		Wdir deg	: 116.3
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight

35 cuft He

Mark, Conrad


















165: RADAR, Site ISS2 (Puerto Penasco), Tue 10-Aug-2004 06:11:07 GMT, Profiler computer restart 10 August 2004 6:00 utc
Profiler computer restart because wind serial output data was not being
transmitted after data archive computer restart on 8 August.  Profiler computer was twice improperly shutdown (first computer froze then power was lost)
Scandisk was run upon restart.  Program now running and wind and serial data 
resumed tranfer to data archive computer.
163: DAILY, Site ISS2 (Puerto Penasco), Mon 09-Aug-2004 23:32:06 GMT, Daily Report 9 Aug 2004
Daily Report 9 August 2004

Sondes launched at 11:00, 18:00, 23:00, 5:00 UTC. All launches successful.

All systems normal.

Profiler disk space: 17.5%

Balloons remaining: 38
Sondes remaining: 33
He tanks remaining: 12

Weather: overcast and precipitation in morning, scattered clouds in afternoon.













162: SOUNDING, Site ISS2 (Puerto Penasco), Mon 09-Aug-2004 22:43:07 GMT, Sounding Launch #101; 10 Aug 2004 0:00z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040809
launch time UTC: 23:00
Sonde coef tape #: 420711511

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.65
Temp C		: 35.8
RH %		: 36.8

		For Surface Data
Pressure mb	: 1007.5
Temp C		: 35.7
RH%		: 41.9
Wind Spd m/s	: 5.1
Wind Dir deg	: 183

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

Partly cloudy with high clouds, southerly winds


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 77.7
Termination Altitude km	: 18.2
Reason for Termination	: finished

Post-Termination Weather Description: scattered high clouds, slight breeze

For Surface Data
		Pressure mb	: 1006.6
     		Temp C		: 35.4
		RH %		: 42.3
		Wspd m/s 	: 4.4
		Wdir deg	: 215
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
reflective shield on humidity sensor fell off after takeoff, but data appeared
reasonable

35 cu. ft He

Mark and Conrad



















161: SOUNDING, Site ISS2 (Puerto Penasco), Mon 09-Aug-2004 16:57:10 GMT, Sounding Launch #100; Aug 2004 18:00z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040809
launch time UTC: 17:15
Sonde coef tape #: 421214105

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1010.4
Temp C		: 34.7
RH %		: 37.8

		For Surface Data
Pressure mb	: 1011.0
Temp C		: 34.9
RH%		: 36.9
Wind Spd m/s	: 2.6
Wind Dir deg	: 118

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

calm, cloudy, recent precipitation
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 73.1
Termination Altitude km	: 18.6
Reason for Termination	: finished

Post-Termination Weather Description:  cloudy, slight breeze, precipitation
during flight

For Surface Data
		Pressure mb	: 1010.7
     		Temp C		: 35.9
		RH %		: 34.7
		Wspd m/s 	: 3.2
		Wdir deg	: 158
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight

light precipitation for several minutes during flight

35 cuft He

Mark, Conrad
















159: SOUNDING, Site ISS2 (Puerto Penasco), Mon 09-Aug-2004 11:00:32 GMT, Sounding Launch #99; 9 Aug 2004 12:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040809
launch time UTC: 11:20
Sonde coef tape #: 421214100

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.5
Temp C		: 28.9
RH %		: 61.4

		For Surface Data
Pressure mb	: 1007.5
Temp C		: 29.5
RH%		: 65.8
Wind Spd m/s	: 2.7
Wind Dir deg	: 115

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

calm, clear but for a few high clouds
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 81.9
Termination Altitude km	: 17.8
Reason for Termination	: finished

Post-Termination Weather Description: overcast, calm

For Surface Data
		Pressure mb	: 1007.7
     		Temp C		: 29.6
		RH %		: 61.1
		Wspd m/s 	: 2.6
		Wdir deg	: 83.3
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight

35 cuft He

Mark, Conrad















158: DAILY, Site ISS2 (Puerto Penasco), Mon 09-Aug-2004 01:08:31 GMT, Daily Report 8 Aug 2004
Daily Report 8 August 2004

Sondes launched at 11:00, 23:00 UTC. All launches successful.

Restarted data computer (server); network connections to ISS, internet 
and profiler computer were made without any problem.

All systems normal.

Roving crew scheduled to leave tommorrow.

Profiler disk space: 14.1%

Balloons remaining: 41
Sondes remaining: 36
He tanks remaining: 13

Weather: clear day.












157: SOUNDING, Site ISS2 (Puerto Penasco), Sun 08-Aug-2004 22:56:14 GMT, Sounding Launch #98; 09 Aug 2004 00:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040808
launch time UTC: 23:00
Sonde coef tape #: 420711610

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1004.7
Temp C		: 36.35
RH %		: 26.9

		For Surface Data
Pressure mb	: 1005.1
Temp C		: 36.5
RH%		: 33.4
Wind Spd m/s	: 4.7
Wind Dir deg	: 232

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

slight breeze, clear
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 
Termination Altitude km	: 
Reason for Termination	: 

Post-Termination Weather Description: 

For Surface Data
		Pressure mb	: 
     		Temp C		: 
		RH %		: 
		Wspd m/s 	: 
		Wdir deg	: 
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------


35 cuft He

Victor, Conrad
















156: INFO, Site ISS2 (Puerto Penasco), Sun 08-Aug-2004 16:27:49 GMT, Roving Team Visit June & Lou.
Saturday Aug 7
An IOP was contiueing 
Display Manager backup was made
Meet with operators asked if they had any concerns on operations or equipment
all seemed fine with how things are running
Asked them to shut down all equipment at the end of project.
There is some question at all sites but especially at this site due to the long drive to Hermosillo when is the final launch of the project. An email needs to 
sent to all sites covering this issue. Students at Penasco have noon flights out
of Hermosillo on the 16th and a 6 hour drive to get there. Local students could cover last flights if need be.


Sunday Aug 8
Surface met was shutdown from approx 16:50 z to 18:05 z.This was to collect
sample files to observe the t-dome and t-case temperatures on the IR sensor 
in an attempt to figure out the spikes in the data.
Profiler was shutdown from 18:40z for approx 1 hour to back up hard drive data.


155: SOUNDING, Site ISS2 (Puerto Penasco), Sun 08-Aug-2004 11:00:47 GMT, Sounding Launch 97#; 09 Aug 2004 12:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040808
launch time UTC: 11:00
Sonde coef tape #: 4210711605

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.5
Temp C		: 26.87
RH %		: 72.3

		For Surface Data
Pressure mb	: 1007.2
Temp C		: 27.0
RH%		: 80.6
Wind Spd m/s	: 2.3
Wind Dir deg	: 94

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

calm, clear
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 80.7
Termination Altitude km	: 17.7
Reason for Termination	: finished

Post-Termination Weather Description: calm, clear but for a few high clouds

For Surface Data
		Pressure mb	: 1007.9
     		Temp C		: 26.3
		RH %		: 77.1
		Wspd m/s 	: 2.11
		Wdir deg	: 78.8
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight

35 cuft He

Conrad















154: SOUNDING, Site ISS2 (Puerto Penasco), Sun 08-Aug-2004 04:53:40 GMT, Sounding Launch #96; 08 Aug 2004 6:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040808
launch time UTC: 5:00
Sonde coef tape #: 420711611

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1005.25
Temp C		: 29.7
RH %		: 65.1

		For Surface Data
Pressure mb	: 1006.0
Temp C		: 29.8
RH%		: 71.6
Wind Spd m/s	: 1.1
Wind Dir deg	: 294

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

calm, clear
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 79.5
Termination Altitude km	: 17.0
Reason for Termination	: finished

Post-Termination Weather Description: calm, clear

For Surface Data
		Pressure mb	: 1006.7
     		Temp C		: 29.2
		RH %		: 75.2
		Wspd m/s 	: 0.9
		Wdir deg	: 138
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight

35 cuft He

Mark, Conrad
















153: DAILY, Site ISS2 (Puerto Penasco), Sat 07-Aug-2004 23:38:55 GMT, Daily Report 7 Aug 2004
Daily Report 7 August 2004

Sondes launched at 11:00, 17:00, 23:00, 5:00 UTC. All launches successful.

The roving crew of Lou and June visited us for a check up.  They should be here tomorrow as well

All systems normal.

Profiler disk space: 86.9%

Balloons remaining: 44
Sondes remaining: 39
He tanks remaining: 13

Weather: mostlly clear day with cumulus clouds to the north

You snooze you lose.  Fresh oysters were good.  Conrad was the winner eating 48 of them











152: SOUNDING, Site ISS2 (Puerto Penasco), Sat 07-Aug-2004 22:36:34 GMT, Sounding Launch #95; 08 Aug 2004 0:00z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040807
launch time UTC: 23:00
Sonde coef tape #: 420711505

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1004.95
Temp C		: 36.24
RH %		: 31.60

		For Surface Data
Pressure mb	: 1006.2
Temp C		: 36.1
RH%		: 33.8
Wind Spd m/s	: 4.3
Wind Dir deg	: 218

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	
clear skies and sea breeze


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 100.4
Termination Altitude km	: 16.6
Reason for Termination	: lost signal

Post-Termination Weather Description: clear skies and a little breeze

For Surface Data
		Pressure mb	: 1005.1
     		Temp C		: 35.1
		RH %		: 37.4
		Wspd m/s 	: 5.3
		Wdir deg	: 243
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
no wind data or satellite data after 250 mb, otherwise good flight

35 cu ft. He

Mark and Victor















151: SOUNDING, Site ISS2 (Puerto Penasco), Sat 07-Aug-2004 16:55:21 GMT, Sounding Launch #94; 07 Aug 2004 18:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040807
launch time UTC: 17:00
Sonde coef tape #: 420711800

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.6
Temp C		: 33.7
RH %		: 38.0

		For Surface Data
Pressure mb	: 1009.5
Temp C		: 34.2
RH%		: 42.6
Wind Spd m/s	: 3.0
Wind Dir deg	: 149

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

clear, calm
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 81.8
Termination Altitude km	: 17.8
Reason for Termination	: finished

Post-Termination Weather Description: calm, clear

For Surface Data
		Pressure mb	: 1009.0
     		Temp C		: 34.2
		RH %		: 44.9
		Wspd m/s 	: 3.6
		Wdir deg	: 184.9
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight

35 cuft He

Victor, Conrad















150: SOUNDING, Site ISS2 (Puerto Penasco), Sat 07-Aug-2004 10:49:25 GMT, Sounding Launch #93; 07 Aug 2004 12:00z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040807
launch time UTC:11:00
Sonde coef tape #: 420712114

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.2
Temp C		: 26.45
RH %		: 85.6

		For Surface Data
Pressure mb	: 1007.9
Temp C		: 26.4
RH%		: 89.7
Wind Spd m/s	: 3.7
Wind Dir deg	: 65

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

clear with calm winds


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 78.4
Termination Altitude km	: 18.0
Reason for Termination	: done

Post-Termination Weather Description: clear skies and calm winds

For Surface Data
		Pressure mb	: 1008.5
     		Temp C		: 26.1
		RH %		: 84.1
		Wspd m/s 	: 2.1
		Wdir deg	: 84
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight

35 cu ft. He

Mark and Conrad



















149: SOUNDING, Site ISS2 (Puerto Penasco), Sat 07-Aug-2004 04:55:38 GMT, Sounding Launch #92; 7 Aug 2004 6:00z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040807
launch time UTC: 5:00
Sonde coef tape #: 4207142113

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.0
Temp C		: 28.4
RH %		: 69.6

		For Surface Data
Pressure mb	: 1008.3
Temp C		: 28.7
RH%		: 75.4
Wind Spd m/s	: 0
Wind Dir deg	: 164?

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

calm, clear
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 81.5
Termination Altitude km	: 17.7
Reason for Termination	: done

Post-Termination Weather Description: clear skies, breeze has started a little

For Surface Data
		Pressure mb	: 1007.8
     		Temp C		: 27.9
		RH %		: 79.1
		Wspd m/s 	: 2.2
		Wdir deg	: 252
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight

35 cuft He

Mark, Conrad


















148: DAILY, Site ISS2 (Puerto Penasco), Sat 07-Aug-2004 00:24:01 GMT, Daily Report 6 Aug 2004
Daily Report 6 August 2004

Sondes launched at 11:00, 17:00, 23:00, 5:00 UTC. All launches successful.

All systems normal.

Profiler disk space: 83.4%

Balloons remaining: 48
Sondes remaining: 43
He tanks remaining: 13

Weather: 12z launching saw spectacular cloud to ground lightning to the eastern horizon.  By sunrise it was raining around the site.  Finally at about 14:30 utc the thunderstorm rolled through the city giving us probably about 1mm of precip. The storm quickly passed and gave sunny skies the rest of the day

TGIF










147: SOUNDING, Site ISS2 (Puerto Penasco), Fri 06-Aug-2004 22:33:27 GMT, Sounding Launch #91; 07 Aug 2004 0:00z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040806
launch time UTC: 23:00
Sonde coef tape #: 420712112

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.55
Temp C		: 35.16
RH %		: 35.8

		For Surface Data
Pressure mb	: 1007.8
Temp C		: 34.7
RH%		: 42.3
Wind Spd m/s	: 5.3
Wind Dir deg	: 196

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

clear at the moment except for rising cumulus clouds to our North, light winds


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	:68.3 
Termination Altitude km	:18.8
Reason for Termination	: finished

Post-Termination Weather Description: clear skies, cumulus clouds to the north

For Surface Data
		Pressure mb	: 1007.2
     		Temp C		: 34.9
		RH %		: 41.4
		Wspd m/s 	: 3.7
		Wdir deg	: 177
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
35 cu ft. He
good flight

Mark and Victor

















146: SOUNDING, Site ISS2 (Puerto Penasco), Fri 06-Aug-2004 17:01:51 GMT, Sounding Launch #90; 06 Aug 2004 18:00z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040806
launch time UTC: 17:20
Sonde coef tape #:420712111

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.6
Temp C		: 32.2
RH %		: 59.3

		For Surface Data
Pressure mb	: 1010.9
Temp C		: 32.2
RH%		: 71.0
Wind Spd m/s	: 4.2
Wind Dir deg	: 155

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

Partly cloudy skies mid and high level clouds, moderate breeze


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 76.1
Termination Altitude km	: 18.3
Reason for Termination	: finished

Post-Termination Weather Description: scattered high clouds, slight breeze

For Surface Data
		Pressure mb	: 1010.9
     		Temp C		: 33.2
		RH %		: 64.3
		Wspd m/s 	: 4.5
		Wdir deg	: 161.8
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
poor of wind data last 300 mb, otherwise good flight

35 cuft He

Mark, Conrad














145: SOUNDING, Site ISS2 (Puerto Penasco), Fri 06-Aug-2004 11:13:40 GMT, Sounding Launch #89; 6 Aug 2004 12:00z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040806
launch time UTC: 11:30
Sonde coef tape #: 420712110

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.86
Temp C		: 27.7
RH %		: 73.8

		For Surface Data
Pressure mb	: 1008.4
Temp C		: 27.9
RH%		: 80.5
Wind Spd m/s	: 1.9
Wind Dir deg	: 86

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

partly cloudy skies, calm winds.  Beautiful cloud to ground lightning on the 
east horizon


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 62.8
Termination Altitude km	: 19.4
Reason for Termination	: finished

Post-Termination Weather Description: mostly cloudy skies, still some lightning to the east, as well as virga and rain off in the east and north horizons

For Surface Data
		Pressure mb	: 1009.5
     		Temp C		: 28.7
		RH %		: 77.5
		Wspd m/s 	: 2.6
		Wdir deg	: 122
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight, sonde antenna was partially bent at launch, but data still looks 
good

as mentioned above the post termination weather, you can see it raining in the 
east and north

35 cu ft. He

















144: SOUNDING, Site ISS2 (Puerto Penasco), Fri 06-Aug-2004 04:53:01 GMT, Sounding Launch #88; 6 Aug 2004 6:00z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040805
launch time UTC: 5:00
Sonde coef tape #:420712109

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1008.7
Temp C		: 30.3
RH %		: 65.2

		For Surface Data
Pressure mb	: 1008.4
Temp C		: 30.4
RH%		: 71.9
Wind Spd m/s	: 1.7
Wind Dir deg	: 140

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

calm, no clouds
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 90.3
Termination Altitude km	: 17.2
Reason for Termination	: finished

Post-Termination Weather Description: calm, clear

For Surface Data
		Pressure mb	: 1008.2
     		Temp C		: 29.2
		RH %		: 79.5
		Wspd m/s 	: 0.9
		Wdir deg	: 62.9
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

good flight

35 cuft He

Victor, Conrad






















143: DAILY, Site ISS2 (Puerto Penasco), Fri 06-Aug-2004 00:36:56 GMT, Daily Report 5 Aug 2004
Daily Report 5 August 2004

Sondes launched at 11:00, 17:00, 23:00, 5:00 UTC. All launches successful.

All systems normal.

Profiler disk space: 80.0%

Balloons remaining: 52
Sondes remaining: 47
He tanks remaining: 14

Cloudy in the morning, scattered clouds in afternoon.

Yeah, whatever Kino.








142: SOUNDING, Site ISS2 (Puerto Penasco), Thu 05-Aug-2004 22:50:12 GMT, Sounding Launch #87; 6 Aug 2004 00:00z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040805
launch time UTC: 23:00
Sonde coef tape #: 420712108

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.5
Temp C		: 35.3
RH %		: 32.6

		For Surface Data
Pressure mb	: 1008.3
Temp C		: 35.0
RH%		: 35.6
Wind Spd m/s	: 6.0
Wind Dir deg	: 186

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

scattered high clouds, moderate breeze
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 89.8
Termination Altitude km	: 17.3
Reason for Termination	: finished

Post-Termination Weather Description: scattered high clouds, moderate breeze

For Surface Data
		Pressure mb	: 1007.4
     		Temp C		: 34.2
		RH %		: 43.6
		Wspd m/s 	: 6.4
		Wdir deg	: 175.4
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------

good flight

35 cuft He

Victor, Conrad



















141: SOUNDING, Site ISS2 (Puerto Penasco), Thu 05-Aug-2004 16:44:25 GMT, Sounding Launch #86; 5 Aug 2004 18:00z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040805
launch time UTC: 17:00
Sonde coef tape #: 420712107

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1009.2
Temp C		: 31.6
RH %		: 59.7

		For Surface Data
Pressure mb	: 1010.6
Temp C		: 31.6
RH%		: 66.2
Wind Spd m/s	: 4.6
Wind Dir deg	: 149

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

cloudy, moderate breeze
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 76.0
Termination Altitude km	: 18.3
Reason for Termination	: finished

Post-Termination Weather Description: cloudy, moderate breeze

For Surface Data
		Pressure mb	: 1010.4
     		Temp C		: 34.1
		RH %		: 6.2
		Wspd m/s 	: 6.1
		Wdir deg	: 153.0
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight

35 cuft He

Mark, Conrad



















140: SOUNDING, Site ISS2 (Puerto Penasco), Thu 05-Aug-2004 10:34:46 GMT, Sounding Launch #85; 5 Aug 2004 12:00z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040805
launch time UTC: 11:00
Sonde coef tape #: 420712106

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.9
Temp C		: 28.7
RH %		: 62.2

		For Surface Data
Pressure mb	: 1007.8
Temp C		: 28.8
RH%		: 70.6
Wind Spd m/s	: 2.2
Wind Dir deg	: 160

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

cloudy, calm
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 85
Termination Altitude km	: 17.5
Reason for Termination	: finished

Post-Termination Weather Description: moderate cloud cover, calm

For Surface Data
		Pressure mb	: 1008.3
     		Temp C		: 28.9
		RH %		: 69.1
		Wspd m/s 	: 2.6
		Wdir deg	: 128.2
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
for several minutes wind data had missing data (99999's) at regular intervals 
(every 8th data point was bad), but otherwise good flight.

35 cuft He

Victor, Conrad

















139: DAILY, Site ISS2 (Puerto Penasco), Wed 04-Aug-2004 23:50:28 GMT, Daily Report 4 Aug 2004
Daily Report 4 August 2004

Sondes launched at 6,12, and 0 UTC. All launches successful.  Preparing for IOP#7 to start 12z 5 Aug.

Profiler disk space: 76.6%

Balloons remaining: 56
Sondes remaining: 50
He tanks remaining: 14

Day has been partly to mostly cloudy throughout the day as high clouds, maybe 
remnents from convection overnight, have blanketed the area

All the systems and equipment are working correctly
Sattelite phone computer automatically restarted itself, but the sattelite was 
still configured and functioning correctly

For lunch Victor, Conrad, Mark, and Hugo cooked up some delicious stuffed crabs and chilli peppers.  Sorry no leftovers!  Saturday we go eat oysters baby.  
Puerto Penasco rocks.










138: SOUNDING, Site ISS2 (Puerto Penasco), Wed 04-Aug-2004 22:34:19 GMT, Sounding Launch #84; 05 Aug 2004 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040804
launch time UTC: 23:00
Sonde coef tape #: 420712115

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.68
Temp C		: 33.56
RH %		: 39.30

		For Surface Data
Pressure mb	: 1007.4
Temp C		: 33.8
RH%		: 30.8
Wind Spd m/s	: 5.3
Wind Dir deg	: 173

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

Mostly cloudy, with high clouds, moderate sea breeze


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 61.2
Termination Altitude km	: 19.7
Reason for Termination	: done

Post-Termination Weather Description: Mostly cloudy (high clouds)with a moderate south wind

For Surface Data
		Pressure mb	: 1006.7
     		Temp C		: 33.0
		RH %		: 38.7
		Wspd m/s 	: 5.2
		Wdir deg	: 178
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Good flight

35 cu ft. He

Mark and Victor



















137: SOUNDING, Site ISS2 (Puerto Penasco), Wed 04-Aug-2004 10:56:59 GMT, Sounding Launch #83; 04 Aug 2004 12z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040804
launch time UTC: 11:15
Sonde coef tape #: 420711802

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.6
Temp C		: 24.1
RH %		: 34.9

		For Surface Data
Pressure mb	: 1006.3
Temp C		: 24.2
RH%		: 39.6
Wind Spd m/s	: 2.3
Wind Dir deg	: 73

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

mostly clear with a slight breeze


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 40.1
Termination Altitude km	: 22.2
Reason for Termination	: lost signal

Post-Termination Weather Description: Few high clouds, calm winds

For Surface Data
		Pressure mb	: 1007.1
     		Temp C		: 24.3
		RH %		: 60.8
		Wspd m/s 	: 2.2
		Wdir deg	: 97
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
Good flight

35 cu ft. He




















136: SOUNDING, Site ISS2 (Puerto Penasco), Wed 04-Aug-2004 04:31:46 GMT, Sounding Launch #82; 04 Aug 2004 6z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040804
launch time UTC: 5:00
Sonde coef tape #: 420711804

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.44
Temp C		: 26.97
RH %		: 40.8

		For Surface Data
Pressure mb	: 1006.9
Temp C		: 27.1
RH%		: 47.6
Wind Spd m/s	: 2.8
Wind Dir deg	: 92

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

Clear skies with calm winds


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 38.7
Termination Altitude km	: 22.5
Reason for Termination	: balloon burst

Post-Termination Weather Description: clear, calm winds

For Surface Data
		Pressure mb	: 1007.1
     		Temp C		: 26.1
		RH %		: 60.3
		Wspd m/s 	: 2.2
		Wdir deg	: 73
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight

35 cu ft. He

Mark and Victor


















135: DAILY, Site ISS2 (Puerto Penasco), Wed 04-Aug-2004 01:06:48 GMT, Daily Report 3 Aug 2004
Daily Report 3 August 2004

Sondes launched at 11:00, 17:00, 23:00, and 5:00 utc. All launches successful.

Profiler disk space: 73.1%

Balloons remaining: 59
Sondes remaining: 53
He tanks remaining: 15

all the systems and equipment are working correctly

we are  going to make some  stuffed crabs and some chili peppers, if somebody of you   reads this, this is an invitation for all ISS, so, come to visit us 




Victor, Conrad, Mark and Hugo




134: SOUNDING, Site ISS2 (Puerto Penasco), Tue 03-Aug-2004 22:25:08 GMT, Sounding Launch #81; 03 Aug 2004 23:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 04 08 03
launch time UTC: 22z
Sonde coef tape #:420711805 

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.3
Temp C		: 33.45
RH %		: 23.8

		For Surface Data
Pressure mb	: 1006.3
Temp C		: 34.3
RH%		: 27.0
Wind Spd m/s	: 4.0
Wind Dir deg	: 199

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

no clouds, sunny, clear sky, a slight breeze from S

------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 30
Termination Altitude km	: 22
Reason for Termination	: finished

Post-Termination Weather Description: 

no clouds, sunny, clear sky a slight breeze

For Surface Data
		Pressure mb	: 1005.2
     		Temp C		: 34.62
		RH %		: 20.23
		Wspd m/s 	: 3.47
		Wdir deg	: 207.07
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
all the systems and equipment are working correctly



good launch

35 cu ft He

Victor,Conrad















133: SOUNDING, Site ISS2 (Puerto Penasco), Tue 03-Aug-2004 16:57:25 GMT, Sounding Launch #80; 03 Aug 2004 18z (IOP)
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040803
launch time UTC: 17:15
Sonde coef tape #: 420711806

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1007.5
Temp C		: 33.95
RH %		: 22.8

		For Surface Data
Pressure mb	: 1008.9
Temp C		: 33.8
RH%		: 23.4
Wind Spd m/s	: 3.3
Wind Dir deg	: 146

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

Clear skies with light breeze


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 68.8
Termination Altitude km	: 19.0
Reason for Termination	: finished

Post-Termination Weather Description: clear, slight breeze

For Surface Data
		Pressure mb	: 1008.6
     		Temp C		: 34.4
		RH %		: 26.7
		Wspd m/s 	: 4.3
		Wdir deg	: 152.5
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight

35 cuft He

Mark, Conrad















132: SOUNDING, Site ISS2 (Puerto Penasco), Tue 03-Aug-2004 11:00:53 GMT, Sounding Launch #79; 03 Aug 2004 12:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 0408
launch time UTC: 11:00
Sonde coef tape #: 420711807

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 10067
Temp C		: 244
RH %		: 501

		For Surface Data
Pressure mb	: 10066
Temp C		: 245
RH%		: 566
Wind Spd m/s	: 29
Wind Dir deg	: 81

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

clear, calm
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 85.0
Termination Altitude km	: 17.1
Reason for Termination	: finished

Post-Termination Weather Description: calm, clear

For Surface Data
		Pressure mb	: 1007.0
     		Temp C		: 24.5
		RH %		: 62.6
		Wspd m/s 	: 2.1
		Wdir deg	: 97.1
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight

35 cuft He

Conrad



















131: DAILY, Site ISS2 (Puerto Penasco), Tue 03-Aug-2004 00:09:53 GMT, Daily Report 2 Aug 2004
Daily Report 2 August 2004

Sondes launched at 11:00, 23:00 utc. All launches successful.

Profiler disk space: 69.6%

Balloons remaining: 63
Sondes remaining: 57
He tanks remaining: 15










130: SOUNDING, Site ISS2 (Puerto Penasco), Mon 02-Aug-2004 22:49:55 GMT, Sounding Launch #78; 03 Aug 2004 0z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040802
launch time UTC: 23:00
Sonde coef tape #: 420711808

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1005.65
Temp C		: 34.1
RH %		: 32.9

		For Surface Data
Pressure mb	: 1007.2
Temp C		: 33.3
RH%		: 36.7
Wind Spd m/s	: 6.3
Wind Dir deg	: 206

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	

Clear skies, moderate breeze, cumulus clouds building to North


------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 69.5
Termination Altitude km	: 18.9
Reason for Termination	: done

Post-Termination Weather Description: clear skies, moderate breeze, cumulus 
clouds to north

For Surface Data
		Pressure mb	: 1006.6
     		Temp C		: 33.5
		RH %		: 26.6
		Wspd m/s 	: 4.3
		Wdir deg	: 201.3
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight

35 cuft He

Mark, Conrad
















129: SOUNDING, Site ISS2 (Puerto Penasco), Mon 02-Aug-2004 11:04:59 GMT, Sounding Launch #77; 02 Aug 2004 12:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Penasco
date yymmdd: 040802
launch time UTC: 11:15
Sonde coef tape #: 420711811

------------------------------------------------------------------------------
MET INFO
--------        For Sonde
Pressure mb	: 1006.2
Temp C		: 29.0
RH %		: 68.7

		For Surface Data
Pressure mb	: 1007.6
Temp C		: 29.0
RH%		: 75.9
Wind Spd m/s	: 5.8
Wind Dir deg	: 137

Pre-Launch		Note conditions not observable by automatic systems
Weather Description	( visibility, sea state, cloud coverage and cloud type, 
		          rain, virga, etc. )

clear, breezy
------------------------------------------------------------------------------
POST TERMINATION
----------------

Termination Pressure mb	: 76.1
Termination Altitude km	: 18.2
Reason for Termination	: finished

Post-Termination Weather Description: scattered clouds, slight breeze

For Surface Data
		Pressure mb	: 1008.4
     		Temp C		: 28.7
		RH %		: 82.0
		Wspd m/s 	: 3.8
		Wdir deg	: 139.2
------------------------------------------------------------------------------
COMMENTS (data quality, unusual meteorolical features, launch problems, etc.)
--------
good flight.


35 cuft He

Mark, Conrad
















128: DAILY, Site ISS2 (Puerto Penasco), Sun 01-Aug-2004 22:49:39 GMT, Daily Report 1 Aug 2004
Daily Report 1 August 2004

Spikes in IR data over past 24 hours, otherwise instruments are working
properly.

Sondes launched at 11:00, 17:00, 23:00 utc. All launches successful.

IOP ends after 23:00 utc launch.

Profiler disk space: 66.0%

Balloons remaining: 65
Sondes remaining: 59
He tanks remaining: 15

13th tank of He finished today.

Made campechana for lunch; it was awsome. If you don't know what campechana
is you are missing out.  Next project: huge clams on the grill and steamed 
blue crabs.

Victor y Conrad










127: SOUNDING, Site ISS2 (Puerto Penasco), Sun 01-Aug-2004 22:48:05 GMT, Sounding Launch #76; 02 Aug 2004 00:00z
=====================
CLASS LAUNCH LOG						 version:951116
=====================
=========>> Enter data after all colons (:)  <<===========

1. Clone the original sounding log file.
2. Enter information before launch.
3. Enter post-termination data.
------------------------------------------------------------------------------
Use arrows to navigate, NO CARRIAGE RET, except in comments + wx descriptions!
------------------------------------------------------------------------------
SITE INFO
---------        

Site Name: Puerto Pena