FOOTPRINT92: Logbook Entries

FOOTPRINT92: PROP Messages: 5 Entries..

Return to Logbook Contents Page
Entry Date Title Site Author #Graphics
25 Sat 06-Jun-1992CORRECTED WIND DIRECTION: nonesrs
115 Wed 17-Jun-1992Climbers on prop tower to install syrin nonetwh
118 Wed 17-Jun-1992Syringe samplers still on prop tower nonetwh
120 Wed 17-Jun-1992Syringe samplers removed from prop towe nonetwh
157 Sat 27-Jun-1992The Splus fun.props.config has had inco nonetwh


25: PROP , Site none, Sat 06-Jun-1992 00:12:42 GMT, CORRECTED WIND DIRECTION:
CORRECTED WIND DIRECTION: 
 
	The wind sensors now have the correct wind 
direction information. Up until now, they were align 
with the towers, ie, 0 degrees represented the wind 
coming directly from the release line. 
 
115: PROP , Site none, Wed 17-Jun-1992 00:08:28 GMT, Climbers on prop tower to install syrin
Climbers on prop tower to install syringe samplers 
from 3:25 - 3:30 pm PDT and 5:20 - 5:45 pm PDT. 
 
 
118: PROP , Site none, Wed 17-Jun-1992 16:20:02 GMT, Syringe samplers still on prop tower
Syringe samplers still on prop tower 
at 1.5, 3, and 6m.  These are boxes 
with dimentsions of ~ 8" wide, 12" 
high, and 24" long and they were 
mounted with the 24" dimension 
horizontal across the back of the 
tower. 
 
 
120: PROP , Site none, Wed 17-Jun-1992 18:59:35 GMT, Syringe samplers removed from prop towe
Syringe samplers removed from prop tower 
about 11 am PDT. 
 
 
157: PROP , Site none, Sat 27-Jun-1992 19:40:26 GMT, The Splus fun.props.config has had inco
The Splus fun.props.config has had incorrect 
boom and array azimuth angles (315) rather 
than the correct values of 294.25 and 210. 
I fixed this today.