- 131: tsoil, Site all, Mon 13-Sep-2004 11:33:33 MDT, Mote positions
Here are the differential GPS positions that Jielun and I recorded and Sean
processed for all of the motes:
2 S16 4.2 Differential Pro XRS 09/09/04 01:49:14PM Point_generic 040909js.cor 33 33 New 0.548946 3017.321 0.346 0.573 -105.542552246 40.035225894
3 S14 2.4 Differential Pro XRS 09/09/04 01:53:35PM Point_generic 040909js.cor 6 6 New 0.065764 3012.645 0.358 0.588 -105.542224866 40.034782658
4 S14 2.4 Differential Pro XRS 09/09/04 01:53:46PM Point_generic 040909js.cor 38 38 New 0.064183 3012.629 0.34 0.56 -105.542222294 40.034784571
5 S24 3.5 Differential Pro XRS 09/09/04 01:55:45PM Point_generic 040909js.cor 40 40 New 0.531069 3014.861 0.38 0.57 -105.542628565 40.034861897
6 S26 6.1 Differential Pro XRS 09/09/04 01:57:05PM Point_generic 040909js.cor 43 43 New 0.966392 3018.644 0.429 0.634 -105.542750096 40.034980507
7 S12 5.1 Differential Pro XRS 09/09/04 02:09:45PM Point_generic 040909js.cor 41 41 New 1.467124 3051.878 0.664 1.053 -105.546927702 40.035984774
8 S13 6.1 Differential Pro XRS 09/09/04 02:13:14PM Point_generic 040909js.cor 37 37 New 0.708117 3054.859 0.562 0.857 -105.547040741 40.036033647
9 S15 5.1 Differential Pro XRS 09/09/04 02:15:37PM Point_generic 040909js.cor 35 35 New 0.307906 3054.728 0.541 0.857 -105.547350065 40.035881324
10 S25 5.1 Differential Pro XRS 09/09/04 02:17:14PM Point_generic 040909js.cor 35 35 New 0.374864 3051.905 0.567 0.997 -105.547148042 40.035733200
11 S22 2.4 Differential Pro XRS 09/09/04 02:18:15PM Point_generic 040909js.cor 40 40 New 0.145362 3087.816 0.342 0.556 -105.551906203 40.035827942
12 S20 2.4 Differential Pro XRS 09/09/04 02:28:08PM Point_generic 040909js.cor 40 40 New 0.063549 3087.473 0.344 0.561 -105.552205907 40.035590072
13 S21 3 Differential Pro XRS 09/09/04 02:30:06PM Point_generic 040909js.cor 41 41 New 0.044024 3089.636 0.441 0.643 -105.552604226 40.035842812
14 S23 4.8 Differential Pro XRS 09/09/04 02:32:11PM Point_generic 040909js.cor 40 40 New 0.231179 3090.865 0.506 1.117 -105.552300276 40.036230728
- 96: tsoil, Site aspen, Fri 20-Aug-2004 16:19:08 MDT, Mote #16 working
8/20/04 ~11:30 local
Put in new batteries to Mote #16 and reinstalled daugther board.
- 92: tsoil, Site pine, Fri 20-Aug-2004 16:11:35 MDT, Mote Tsoils Planted
8/20/04 ~15:15 local
Mote #20 (A) buried at 5cm 'yellow' and 'orange'
Mote #21 (B) buried at 5cm 'yellow'
These were easy to install and appeared that possibly and
elk/deer/moose had possibly pulled them out but that's not
certain.
Mote #18(old 23 site) covered wires so the squirrel won't
see-em.
Took photos of all motes
- 85: tsoil, Site willow, Tue 17-Aug-2004 15:20:38 MDT, Tsoil work
~13:25 local
Installed Mote18 in place of #23. This mote has proper calibrations
for lm20 strings and it's own vref value so the data should be OK.
SO changed id number in prep.config so it should be covared/etc.
Why in the world did i do this: wrapped foil around all tsoil mote
stand. This site is so wet i doubt any self-respecting chipmonk
would go for these with exception of at #18. That mote has most
of the wires exposed on the ground from the post to the dirt
entry point. They need to be dug in later if possible.
- 83: tsoil, Site pine, Tue 17-Aug-2004 15:17:17 MDT, Tsoil work
14:45 local
Wrapped foil on all tsoil motes. Did better job than other sites because
the wires were dug in here and i could skirt the bottom and cover with
debri.
Note Mote12 is 3' from burrow....yikes! could explain why 3 are dead
and there are lots of tiny pieces of wire around. At least 2 visible
cuts that might be repairable when rain quits.
- 82: tsoil, Site aspen, Tue 17-Aug-2004 13:01:53 MDT, Tsoil work
12:30-12:45
Mote 16 Needs AA batteries! Has low voltage.
Tried to add foil around posts for 16,24,25 but not 15.
Need to bring trowel to dig the wires into the gnd from
post to where probe is.
Lightning in area, decided to wait / move-on.
- 71: tsoil, Site all, Tue 10-Aug-2004 17:56:19 MDT, Tsoil Mote Work, All Sites
08/10/04
Motes were checked that appeared to have 'drained batteries'
PINE:
Note: all 4 motes at this site had the old style regulator that drains
the batteries with leakage current. All appeared to be trying to report.
A, #12, 2.5V, disabled regulator and added Alkaline batt, 3.2V, PV disconnected
Per 'prep' at aspen, tsoils 3,4,5 are bad
B, #13, 2.7V, disabled regulator and added Alkaline batt, 3.2V, PV disconnected
Per 'prep' at aspen, tsoils 2,6 are bad
Rodent chewed through 1 of these sets at least.
C, #15, 2.1V, retrieved to reconfigure in Boulder due to wiring method
D, #25, 2.5V, retrieved to reconfigure in Boulder due to wiring method
WILLOW:
D, #23, 1.4V, was not reporting,
old style regulator on this unit disabled and added Alkaline batt, 3.2V
NOTE: at aster/prep indicated that it is still down.....rf problems?
NOTE: one sensor is sitting on the ground and not installed in soil
ASPEN:
Note: all 4 motes here have the newer 'zener' regulator, although 2 were down.
by examination of the 1st two noted, this approach seems to work.
A, #14, 3.1V, observed normal reporting 'blink' but base isn't receiving
NOTE: poor exposure behind some bushes/trees but worse the receiving
antenna is on the opposite side of the tower and although we tried
to improve the situation, it still appears to not be heard by the base.
D, #26, 3.1V, red-led on continuously, not reporting.
NOTE: it somewhat appeared that the battery and daughter boards were
not well secured which is possibly its problem. We taped the batteries
in and secured the daughter board and then it began reporting.
- 50: tsoil, Site all, Tue 03-Aug-2004 10:05:38 MDT, Tsoil status
willow: .A.b high; .B.c high; .C ok; .D 30 bad,.c high, .d bad
pine: .A missing some 5cm; .B ok; .C ok; .D ok
aspen: .A ok; .B 30/15 bad; .C no tsoil; .D no signal
- 42: tsoil, Site aspen, Thu 29-Jul-2004 21:58:27 MDT, Mote14 installed at Aspen
This comment from yesterday, when I couldn't get through on the net:
Location is about 8m N of the outer SE guy point, in a peat bog. I mixed
up Brown and Black, so Brown is at 15cm, Black is at 10cm, and the rest at 5cm.
All holes filled up with water to about 5cm when dug out, so the sensors were
installed at, or below, water line in peat.
This should complete installation of all the Tsoil probes!
- 26: tsoil, Site willow, Mon 12-Jul-2004 07:44:57 MDT, Visit to Willow
Three tsoil sensors were removed to have voltage regulators added to the power system.
This took place last Thursday afternoon.
- 19: tsoil, Site willow, Thu 24-Jun-2004 09:17:38 MDT, mote23 erratic
mote#23 has been dying over the last 2 days -- perhaps due to too much power.