Sixth operational period


ops6: jd(1994, 228, 01:31:00 - 1994, 231, 17:00:00)

The two PVMs were interchanged. The OSU PVM was moved to 10 m on the walk tower (marigold 111,c.opvm.10m.walk) and the GSI PVM to 10 m on the flux tower (cosmos 102, c.gpvm.10m.flux) (See logbook entries #111 and 112)

On day 229 at 05:05 the scratch channels on marigold were used to sample t.cell.licor (marigold 113) and flowrate.licor (marigold 114). The scratch channel, marigold 112 was not being used (See logbook #127)