The two PVMs were moved. The OSU PVM was operated at 10. m on the flux tower (cosmos 102, c.opvm.10m.flux) and the GSI PVM at 15 m on the flux tower (cosmos 105, c.gpvm.15m.flux). (See logbook entry #36)
The AIR humidity unit failed on day 221.